Storage yard space sealing system
The invention discloses a storage yard space sealing system, which comprises a spanning reticulated shell structure, a cross-direction reticulated shell structure, a cross-direction reticulated shell structure, a cross-direction reticulated shell structure, a cross-direction reticulated shell structure and a cross-direction reticulated shell structure, the pair of gable wall structures is used for sealing the two sides of the spanning reticulated shell structure in the width direction of the storage yard; and the whole gable wall structure at least located at one end of the extending direction of the storage yard is detachably connected with the spanning reticulated shell structure. Due to the fact that the whole gable wall structure is detachably connected with the straddle-direction latticed shell structure, when the scale of a storage yard needs to be enlarged or the closed length of the storage yard needs to be prolonged, the whole gable wall structure is directly detached from the straddle-direction latticed shell structure, and then the whole gable wall structure is moved to a proper storage position. And when the scale is enlarged or the storage yard is lengthened, the gable wall structure is integrally moved to a closed position to be installed. Therefore, the dismounting and mounting construction period of the gable wall structure can be directly omitted, the construction period is greatly shortened, and the working process is greatly simplified.
本发明公开了一种堆场空间封闭体系,该堆场空间封闭体系包括:跨向网壳结构,呈拱形,向堆场的长度方向延伸;一对山墙结构,沿所述堆场的宽度方向,将所述跨向网壳结构的两侧进行封闭;至少位于所述堆场延伸方向一端的山墙结构的整体与所述跨向网壳结构可拆卸连接。由于是山墙结构的整体与所述跨向网壳结构可拆卸连接,所以,在需要扩大堆场规模或者延长堆场的封闭长度时,直接将山墙结构整体从跨向网壳结构拆卸下来,然后将山墙结构整体移动到合适的存放处。在扩大规模或延长堆场完成时,再将山墙结构整体移动到封闭位置进行安装。如此而言,可以直接省去山墙结构的拆除和安装工期,大幅减少了工期,并且极大地简化了工作流程。
Storage yard space sealing system
The invention discloses a storage yard space sealing system, which comprises a spanning reticulated shell structure, a cross-direction reticulated shell structure, a cross-direction reticulated shell structure, a cross-direction reticulated shell structure, a cross-direction reticulated shell structure and a cross-direction reticulated shell structure, the pair of gable wall structures is used for sealing the two sides of the spanning reticulated shell structure in the width direction of the storage yard; and the whole gable wall structure at least located at one end of the extending direction of the storage yard is detachably connected with the spanning reticulated shell structure. Due to the fact that the whole gable wall structure is detachably connected with the straddle-direction latticed shell structure, when the scale of a storage yard needs to be enlarged or the closed length of the storage yard needs to be prolonged, the whole gable wall structure is directly detached from the straddle-direction latticed shell structure, and then the whole gable wall structure is moved to a proper storage position. And when the scale is enlarged or the storage yard is lengthened, the gable wall structure is integrally moved to a closed position to be installed. Therefore, the dismounting and mounting construction period of the gable wall structure can be directly omitted, the construction period is greatly shortened, and the working process is greatly simplified.
本发明公开了一种堆场空间封闭体系,该堆场空间封闭体系包括:跨向网壳结构,呈拱形,向堆场的长度方向延伸;一对山墙结构,沿所述堆场的宽度方向,将所述跨向网壳结构的两侧进行封闭;至少位于所述堆场延伸方向一端的山墙结构的整体与所述跨向网壳结构可拆卸连接。由于是山墙结构的整体与所述跨向网壳结构可拆卸连接,所以,在需要扩大堆场规模或者延长堆场的封闭长度时,直接将山墙结构整体从跨向网壳结构拆卸下来,然后将山墙结构整体移动到合适的存放处。在扩大规模或延长堆场完成时,再将山墙结构整体移动到封闭位置进行安装。如此而言,可以直接省去山墙结构的拆除和安装工期,大幅减少了工期,并且极大地简化了工作流程。
Storage yard space sealing system
一种堆场空间封闭体系
ZHU MING (Autor:in) / DING SHENGXIAO (Autor:in) / SHI XIN (Autor:in) / ZHAO GUANGMING (Autor:in) / ZHAO XINHUI (Autor:in) / WANG QIONGQIONG (Autor:in) / LI MENG (Autor:in) / ZHANG XINCHUN (Autor:in)
23.06.2023
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD
Europäisches Patentamt | 2025
|CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD