Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated cushion layer of silt geology bottom plate
The invention relates to the technical field of prefabricated cushion layers, in particular to a silt geology bottom plate prefabricated cushion layer which comprises a prefabricated cushion plate, a sealing connecting plate, an adjusting rotating groove, a second adjusting cylinder, a third adjusting shaft, a sealing inserting groove and a sealing inserting plate. The device has the beneficial effects that a first bevel gear at the other end of a first bevel gear is matched with a second bevel gear at the upper end of a first adjusting shaft to drive the first adjusting shaft to rotate, and at the moment, the rotating direction of the first adjusting shaft is opposite to that of a third adjusting shaft; the thread screwing directions of a first adjusting cylinder and a first adjusting shaft are opposite to the thread screwing directions of a third adjusting shaft and a second adjusting cylinder, so that the first adjusting shaft and the third adjusting shaft drive an upper-layer prefabricated base plate to be adjusted in the same direction up and down, and then the supporting strength of the upper-layer prefabricated base plate is improved; height compensation is guaranteed when the prefabricated base plate sinks in the laying process, and flatness of the cushion layer is guaranteed conveniently.
本发明涉及预制垫层技术领域,具体为一种淤泥地质底板预制垫层,包括:预制垫板、密封连板、调节转槽、第二调节筒、第三调节轴、密封插槽及密封插板;有益效果为:通过第一锥齿轮另一端的第一锥齿轮与第一调节轴上端的第二锥齿轮配合,带动第一调节轴转动,此时第一调节轴转动方向与第三调节轴转动方向相反,且通过第一调节筒和第一调节轴的螺纹旋向与第三调节轴和第二调节筒的螺纹旋向相反,使得第一调节轴与第三调节轴带动上层的预制垫板上下同向调节,进而增加了上层预制垫板的支撑强度,并且通过对预制垫板的高度进行调节,保证预制垫板在铺设中下沉时进行高度补偿,便于保证垫层的平整。
Prefabricated cushion layer of silt geology bottom plate
The invention relates to the technical field of prefabricated cushion layers, in particular to a silt geology bottom plate prefabricated cushion layer which comprises a prefabricated cushion plate, a sealing connecting plate, an adjusting rotating groove, a second adjusting cylinder, a third adjusting shaft, a sealing inserting groove and a sealing inserting plate. The device has the beneficial effects that a first bevel gear at the other end of a first bevel gear is matched with a second bevel gear at the upper end of a first adjusting shaft to drive the first adjusting shaft to rotate, and at the moment, the rotating direction of the first adjusting shaft is opposite to that of a third adjusting shaft; the thread screwing directions of a first adjusting cylinder and a first adjusting shaft are opposite to the thread screwing directions of a third adjusting shaft and a second adjusting cylinder, so that the first adjusting shaft and the third adjusting shaft drive an upper-layer prefabricated base plate to be adjusted in the same direction up and down, and then the supporting strength of the upper-layer prefabricated base plate is improved; height compensation is guaranteed when the prefabricated base plate sinks in the laying process, and flatness of the cushion layer is guaranteed conveniently.
本发明涉及预制垫层技术领域,具体为一种淤泥地质底板预制垫层,包括:预制垫板、密封连板、调节转槽、第二调节筒、第三调节轴、密封插槽及密封插板;有益效果为:通过第一锥齿轮另一端的第一锥齿轮与第一调节轴上端的第二锥齿轮配合,带动第一调节轴转动,此时第一调节轴转动方向与第三调节轴转动方向相反,且通过第一调节筒和第一调节轴的螺纹旋向与第三调节轴和第二调节筒的螺纹旋向相反,使得第一调节轴与第三调节轴带动上层的预制垫板上下同向调节,进而增加了上层预制垫板的支撑强度,并且通过对预制垫板的高度进行调节,保证预制垫板在铺设中下沉时进行高度补偿,便于保证垫层的平整。
Prefabricated cushion layer of silt geology bottom plate
一种淤泥地质底板预制垫层
YU LEI (Autor:in) / GAO HONGGANG (Autor:in) / SONG YIXING (Autor:in) / LIU YUAN (Autor:in) / ZHANG JIANWEI (Autor:in) / ZHANG SI (Autor:in) / FAN FANGGEN (Autor:in) / ZHU CHENYANG (Autor:in) / SUN KEPING (Autor:in) / HUANG XIPING (Autor:in)
27.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated concrete cushion layer and using method
Europäisches Patentamt | 2023
|Preparation method of prefabricated bottom plate and prefabricated laminated plate
Europäisches Patentamt | 2023
|Honeycomb-shaped prefabricated building prefabricated top plate (bottom plate) component
Europäisches Patentamt | 2024
|Deep silt soil layer prefabricated tubular pile skip-piling construction method
Europäisches Patentamt | 2021
|Prefabricated ribbed reinforced concrete bottom plate
Europäisches Patentamt | 2020
|