Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete steel-clad beam steel bar binding structure
The invention relates to the technical field of steel-clad beams, in particular to a concrete steel-clad beam steel bar binding structure which comprises a mounting base, the mounting base comprises a pipe sleeve integrally formed at the upper end and a base at the lower end, and a steel pipe is inserted into the interior of the upper end of the pipe sleeve; four tapered wedge mechanisms for supporting vertical steel pipes are fixed on the outer surface of the mounting base; the four mounting bases are used for supporting the four corners of the concrete steel-clad steel, and the two transverse steel bars are used as main bars to support the concrete steel-clad steel and support the concrete steel-clad steel during binding, so that concrete can be cushioned to prevent the concrete steel-clad steel from sinking on the formwork, and gaps exist between the lower end of the concrete steel-clad steel and the formwork to facilitate tightening of the concrete steel-clad steel and the transverse steel bars by the binding hoops; the steel pipe supporting steel bar serves as a main bar at the upper end of the concrete steel-clad steel and is conveniently sleeved with a binding hoop, a steel bar cage is bound outside the concrete steel-clad steel, and after the concrete steel-clad steel is placed, when the steel pipe is inserted into the sleeve and bound on the mounting base, the steel bar connecting sleeve is firmly fixed on the mounting base together to support the transverse steel bar, and rapidness and convenience are achieved.
本发明涉及包钢梁技术领域,具体的说是一种砼包钢梁钢筋绑扎结构,包括安装基座,所述安装基座包括上端一体成型的管套以及下端的底座,所述管套上端内部用于插入钢管,所述安装基座的外表面固定有四个用于支撑竖向钢管的斜楔机构;利用四个安装基座支撑砼包钢的四角,两个横钢筋绑扎时作为主筋支撑砼包钢,对砼包钢进行支撑,一是可以垫起砼,防止砼包钢在模板上下沉,二是使砼包钢下端与模板之间存在缝隙,方便扎箍扎紧砼包钢和横钢筋,钢管支撑钢筋作为砼包钢上端主筋,方便套上扎箍,在砼包钢外部绑扎钢筋笼,当砼包钢放置完成后,在钢管插入套筒绑扎在安装基座上时,使得钢筋连接套一起牢固在安装基座上,支撑横钢筋,快速便捷。
Concrete steel-clad beam steel bar binding structure
The invention relates to the technical field of steel-clad beams, in particular to a concrete steel-clad beam steel bar binding structure which comprises a mounting base, the mounting base comprises a pipe sleeve integrally formed at the upper end and a base at the lower end, and a steel pipe is inserted into the interior of the upper end of the pipe sleeve; four tapered wedge mechanisms for supporting vertical steel pipes are fixed on the outer surface of the mounting base; the four mounting bases are used for supporting the four corners of the concrete steel-clad steel, and the two transverse steel bars are used as main bars to support the concrete steel-clad steel and support the concrete steel-clad steel during binding, so that concrete can be cushioned to prevent the concrete steel-clad steel from sinking on the formwork, and gaps exist between the lower end of the concrete steel-clad steel and the formwork to facilitate tightening of the concrete steel-clad steel and the transverse steel bars by the binding hoops; the steel pipe supporting steel bar serves as a main bar at the upper end of the concrete steel-clad steel and is conveniently sleeved with a binding hoop, a steel bar cage is bound outside the concrete steel-clad steel, and after the concrete steel-clad steel is placed, when the steel pipe is inserted into the sleeve and bound on the mounting base, the steel bar connecting sleeve is firmly fixed on the mounting base together to support the transverse steel bar, and rapidness and convenience are achieved.
本发明涉及包钢梁技术领域,具体的说是一种砼包钢梁钢筋绑扎结构,包括安装基座,所述安装基座包括上端一体成型的管套以及下端的底座,所述管套上端内部用于插入钢管,所述安装基座的外表面固定有四个用于支撑竖向钢管的斜楔机构;利用四个安装基座支撑砼包钢的四角,两个横钢筋绑扎时作为主筋支撑砼包钢,对砼包钢进行支撑,一是可以垫起砼,防止砼包钢在模板上下沉,二是使砼包钢下端与模板之间存在缝隙,方便扎箍扎紧砼包钢和横钢筋,钢管支撑钢筋作为砼包钢上端主筋,方便套上扎箍,在砼包钢外部绑扎钢筋笼,当砼包钢放置完成后,在钢管插入套筒绑扎在安装基座上时,使得钢筋连接套一起牢固在安装基座上,支撑横钢筋,快速便捷。
Concrete steel-clad beam steel bar binding structure
一种砼包钢梁钢筋绑扎结构
ZHU JIAYI (Autor:in) / SHEN YANHONG (Autor:in) / CHEN XINDA (Autor:in) / LIN CHENGCHEN (Autor:in) / GUO LINGFANG (Autor:in) / HUANG ZHEBO (Autor:in) / HUANG YI (Autor:in)
27.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Archaized building beam column wood-clad steel structure
Europäisches Patentamt | 2022
|Concrete steel-clad foundation module and modular box type UHPC steel-clad support foundation
Europäisches Patentamt | 2024
|