Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a semi-prefabricated plastic runway, and aims to solve the technical problems that a large amount of time and cost are wasted at present and the flatness of plastic is difficult to set, the semi-prefabricated plastic runway comprises a base layer, and a base treatment layer, an adhesive layer, an elastic layer, a reinforcing layer and a surface layer are sequentially arranged at the upper end of the base layer; the basic treatment layer, the adhesive layer, the elastic layer, the reinforcing layer and the surface layer jointly form the plastic track. The method has the advantages that the technical requirement for constructors is not high, the leveling effect can be achieved, construction can be continued without waiting for drying layer by layer, a large amount of construction time can be saved, factory customization production can be achieved according to customer requirements, the material cost is reduced, customer funds are saved, and the influence of environmental factors is small.
本发明涉及一种半预制型塑胶跑道,旨在解决当前浪费大量时间和成本,同时,塑胶平整性设置困难的技术问题,包括基础层,基础层上端依次设置有基础处理层、粘胶层、弹性层、加强层以及面层,基础处理层、粘胶层、弹性层、加强层以及面层共同构成塑胶跑道。本发明具有对施工人员的技术要求不高,就可以达到平整的效果,并且不需要一层一层地等干了才能继续施工,可以节省大量的施工时间,工厂根据客户需要即可定制生产,材料成本降低,节约客户资金,受环境因素影响小的优点。
The invention relates to a semi-prefabricated plastic runway, and aims to solve the technical problems that a large amount of time and cost are wasted at present and the flatness of plastic is difficult to set, the semi-prefabricated plastic runway comprises a base layer, and a base treatment layer, an adhesive layer, an elastic layer, a reinforcing layer and a surface layer are sequentially arranged at the upper end of the base layer; the basic treatment layer, the adhesive layer, the elastic layer, the reinforcing layer and the surface layer jointly form the plastic track. The method has the advantages that the technical requirement for constructors is not high, the leveling effect can be achieved, construction can be continued without waiting for drying layer by layer, a large amount of construction time can be saved, factory customization production can be achieved according to customer requirements, the material cost is reduced, customer funds are saved, and the influence of environmental factors is small.
本发明涉及一种半预制型塑胶跑道,旨在解决当前浪费大量时间和成本,同时,塑胶平整性设置困难的技术问题,包括基础层,基础层上端依次设置有基础处理层、粘胶层、弹性层、加强层以及面层,基础处理层、粘胶层、弹性层、加强层以及面层共同构成塑胶跑道。本发明具有对施工人员的技术要求不高,就可以达到平整的效果,并且不需要一层一层地等干了才能继续施工,可以节省大量的施工时间,工厂根据客户需要即可定制生产,材料成本降低,节约客户资金,受环境因素影响小的优点。
Semi-prefabricated plastic runway
半预制型塑胶跑道
WANG JUN (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Semi-prefabricated polyurethane runway and construction process thereof
Europäisches Patentamt | 2022
|