The invention relates to a steel structure pre-embedded column foot, and belongs to the technical field of steel structures. A steel structure embedded column base is of a two-section structure. The first section comprises an embedded column embedded in a concrete foundation and a connecting plate connected with the top of the embedded column into a whole. The second section comprises an exposed column welded and fixed to the upper end face of the connecting plate. On the basis of an existing non-exposed column base, the steel column is installed in a two-section mode, in the period of time when a second section of exposed column is waited to be transported to the site, the first section of embedded column can be pre-embedded in the site, then the first section of embedded column can enter the maintenance period immediately, the waiting period can be greatly shortened, and the construction period is shortened.
本发明涉及一种钢结构预埋式柱脚,属于钢结构技术领域。一种钢结构预埋式柱脚,为二段式结构:第一段包括:预埋在混凝土基础中的埋入柱、与埋入柱顶部连为一体的连接板;第二段包括:焊接固定在所述连接板上端面的露出柱。本发明基于现有非外露式柱脚,对钢柱进行了“二段式”安装,可以在等待第二段的露出柱运达现场的这段时间内,率先对第一段的埋入柱进行现场预埋,然后可以立即进入养护期,可大幅缩短等待期,节约了工期。
The invention relates to a steel structure pre-embedded column foot, and belongs to the technical field of steel structures. A steel structure embedded column base is of a two-section structure. The first section comprises an embedded column embedded in a concrete foundation and a connecting plate connected with the top of the embedded column into a whole. The second section comprises an exposed column welded and fixed to the upper end face of the connecting plate. On the basis of an existing non-exposed column base, the steel column is installed in a two-section mode, in the period of time when a second section of exposed column is waited to be transported to the site, the first section of embedded column can be pre-embedded in the site, then the first section of embedded column can enter the maintenance period immediately, the waiting period can be greatly shortened, and the construction period is shortened.
本发明涉及一种钢结构预埋式柱脚,属于钢结构技术领域。一种钢结构预埋式柱脚,为二段式结构:第一段包括:预埋在混凝土基础中的埋入柱、与埋入柱顶部连为一体的连接板;第二段包括:焊接固定在所述连接板上端面的露出柱。本发明基于现有非外露式柱脚,对钢柱进行了“二段式”安装,可以在等待第二段的露出柱运达现场的这段时间内,率先对第一段的埋入柱进行现场预埋,然后可以立即进入养护期,可大幅缩短等待期,节约了工期。
Steel structure pre-embedded column foot
钢结构预埋式柱脚
LIU SHUZHI (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
Steel structure embedded type column foot and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Column foot bottom plate, embedded type column foot and column foot construction method