Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Longitudinal rib superposed shear wall structure wall body construction method
The invention relates to the technical field of shear wall construction, and particularly discloses a longitudinal rib laminated shear wall structure wall body construction method which comprises the steps of hoisting of a prefabricated wall body, installation of the prefabricated wall body, perpendicularity detection and supporting of the prefabricated wall body, grouting of the prefabricated wall body, pouring of a post-pouring area, maintenance and the like. The flow guide pipe can guide concrete poured into the prefabricated wall body, so that the concrete in the cavity can be guided into the communicating groove below the window of the prefabricated wall body along the flow guide pipe, and the communicating groove in the bottom of the prefabricated wall body and the space of the prefabricated wall body are filled with the concrete more compactly; therefore, the construction of the prefabricated wall body is firmer, and the construction quality is better.
本申请涉及剪力墙施工技术领域,具体公开了一种纵肋叠合剪力墙结构墙体施工方法,包括预制墙体的吊运、预制墙体的安装、预制墙体的垂直度检测及支撑、预制墙体灌浆、后浇区浇灌以及养护等步骤,本申请中设置的导流管能够对灌注进预制墙体内的混凝土进行导向,使空腔内的混凝土能够顺着导流管导入预制墙体的窗口下方的连通槽内,从而使预制墙体底部连通槽及预制墙体空间内混凝土的填充更加密实,以此来使预制墙体的施工更加牢固,施工质量更好。
Longitudinal rib superposed shear wall structure wall body construction method
The invention relates to the technical field of shear wall construction, and particularly discloses a longitudinal rib laminated shear wall structure wall body construction method which comprises the steps of hoisting of a prefabricated wall body, installation of the prefabricated wall body, perpendicularity detection and supporting of the prefabricated wall body, grouting of the prefabricated wall body, pouring of a post-pouring area, maintenance and the like. The flow guide pipe can guide concrete poured into the prefabricated wall body, so that the concrete in the cavity can be guided into the communicating groove below the window of the prefabricated wall body along the flow guide pipe, and the communicating groove in the bottom of the prefabricated wall body and the space of the prefabricated wall body are filled with the concrete more compactly; therefore, the construction of the prefabricated wall body is firmer, and the construction quality is better.
本申请涉及剪力墙施工技术领域,具体公开了一种纵肋叠合剪力墙结构墙体施工方法,包括预制墙体的吊运、预制墙体的安装、预制墙体的垂直度检测及支撑、预制墙体灌浆、后浇区浇灌以及养护等步骤,本申请中设置的导流管能够对灌注进预制墙体内的混凝土进行导向,使空腔内的混凝土能够顺着导流管导入预制墙体的窗口下方的连通槽内,从而使预制墙体底部连通槽及预制墙体空间内混凝土的填充更加密实,以此来使预制墙体的施工更加牢固,施工质量更好。
Longitudinal rib superposed shear wall structure wall body construction method
一种纵肋叠合剪力墙结构墙体施工方法
WANG HUI (Autor:in) / WANG YONG (Autor:in) / YUAN SEN (Autor:in) / SHA FULIANG (Autor:in) / XIA YUNLONG (Autor:in) / GE LINA (Autor:in) / ZHANG ZHIQIN (Autor:in) / ZONG ZHAOMIN (Autor:in) / LUO NING (Autor:in) / LI XIAOXIA (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|Superposed structure of underground diaphragm wall and lining wall and construction method thereof
Europäisches Patentamt | 2023
|