Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated shear wall connecting structure
The invention relates to the technical field of fabricated building walls, solves the problem that in the prior art, a worker needs to hold a wall with hands during hole alignment, and discloses a fabricated shear wall connecting structure which comprises a plurality of sleeves arranged on the side, close to the ground, of a shear wall, a plurality of positioning anchors and a take-up assembly. The take-up assembly is used for winding or releasing a traction rope, a correction frame is arranged at the end, close to the ground, of each sleeve, a plurality of correction rods are connected to the inner wall of the correction frame in a circumferential array mode, one ends of the correction rods are hinged to the correction frame, an elastic assembly is arranged in the correction frame, and the sleeves are connected with pouring pipes. The position of the shear wall can be adjusted by observing the relative position of the positioning anchor and the to-be-connected floor steel bar frame, so that the sleeve is aligned with the steel bar frame, and meanwhile, in the descending process of the shear wall, the correction rod drives the sleeve to move to the position corresponding to the center of the steel bar frame under the counter-acting force of the elastic assembly.
本申请涉及装配式建筑墙体的技术领域,改善了现有技术中对孔时需要依靠工人手扶墙体的问题,公开了一种装配式剪力墙连接结构,其包括设置于剪力墙靠近地面一侧的若干套筒、若干定位锚和收线组件,定位锚一端设置有牵引绳,收线组件用于收卷或释放牵引绳,套筒靠近地面的一端设置有校正框,校正框内壁上周向阵列连接有若干校正杆,若干校正杆一端均铰接于校正框上,校正框中设置有弹性组件,若干套筒均连接有浇筑管。本申请能够通过观察定位锚与待连接的楼面钢筋框架的相对位置,而调节剪力墙位置,使得套筒与钢筋框架对齐,同时在剪力墙下降过程中,校正杆在弹性组件的反作用力下,带动套筒移动至与钢筋框架中心对应的位置上。
Fabricated shear wall connecting structure
The invention relates to the technical field of fabricated building walls, solves the problem that in the prior art, a worker needs to hold a wall with hands during hole alignment, and discloses a fabricated shear wall connecting structure which comprises a plurality of sleeves arranged on the side, close to the ground, of a shear wall, a plurality of positioning anchors and a take-up assembly. The take-up assembly is used for winding or releasing a traction rope, a correction frame is arranged at the end, close to the ground, of each sleeve, a plurality of correction rods are connected to the inner wall of the correction frame in a circumferential array mode, one ends of the correction rods are hinged to the correction frame, an elastic assembly is arranged in the correction frame, and the sleeves are connected with pouring pipes. The position of the shear wall can be adjusted by observing the relative position of the positioning anchor and the to-be-connected floor steel bar frame, so that the sleeve is aligned with the steel bar frame, and meanwhile, in the descending process of the shear wall, the correction rod drives the sleeve to move to the position corresponding to the center of the steel bar frame under the counter-acting force of the elastic assembly.
本申请涉及装配式建筑墙体的技术领域,改善了现有技术中对孔时需要依靠工人手扶墙体的问题,公开了一种装配式剪力墙连接结构,其包括设置于剪力墙靠近地面一侧的若干套筒、若干定位锚和收线组件,定位锚一端设置有牵引绳,收线组件用于收卷或释放牵引绳,套筒靠近地面的一端设置有校正框,校正框内壁上周向阵列连接有若干校正杆,若干校正杆一端均铰接于校正框上,校正框中设置有弹性组件,若干套筒均连接有浇筑管。本申请能够通过观察定位锚与待连接的楼面钢筋框架的相对位置,而调节剪力墙位置,使得套筒与钢筋框架对齐,同时在剪力墙下降过程中,校正杆在弹性组件的反作用力下,带动套筒移动至与钢筋框架中心对应的位置上。
Fabricated shear wall connecting structure
一种装配式剪力墙连接结构
LIN QIAO (Autor:in) / WENG WENHUI (Autor:in) / LIU XINYONG (Autor:in) / HU FENGBIN (Autor:in) / LIN QIN (Autor:in)
07.07.2023
Patent
Elektronische Ressource
Chinesisch
Fabricated shear wall horizontal connecting structure
Europäisches Patentamt | 2022
|Fabricated shear wall structure vertical connecting structure
Europäisches Patentamt | 2020
|