Prefabricated flue split-level installation construction method
The invention relates to a split-level installation construction method for a prefabricated flue. The method comprises the following steps that S1, a sunken groove is formed in a bottom plate of the first layer; s2, positioning and mounting the first section of prefabricated flue; s3, building a wall column template by taking two adjacent outer wall surfaces of the first section of prefabricated flue as templates, and building a floor template by taking the other two adjacent outer wall surfaces as templates; s4, concrete is poured; s5, a second layer is constructed, and the standard section prefabricated flue is installed on the first section prefabricated flue; s6, construction of wall columns and floor slab main structures of the second layer is completed; s7, main structure construction of wall columns and floor slabs of subsequent floors is completed with the standard knot prefabricated flue as a formwork in sequence; s8, top layer construction is conducted, and top layer prefabricated flues are installed on the standard knot prefabricated flues; s9, main structures of wall columns and floor slabs on the top layer are constructed; and S10, the upturning concrete structure is arranged. The formed wall columns and floor slabs directly make contact with the outer wall face of the prefabricated flue, it is guaranteed that the joints are tightly combined, and the water leakage phenomenon is greatly reduced.
本发明涉及一种预制烟道错层安装施工方法,包括以下步骤:S1:首层底板开设下陷凹槽;S2:首节预制烟道定位安装;S3:以首节预制烟道的相邻两外壁面为模板搭建墙柱模板,以另外两个相邻外壁面为模板搭建楼板模板;S4:浇筑混凝土;S5:第二层施工,将标准节预制烟道安装在首节预制烟道上;S6:完成第二层的墙柱、楼板主结构施工;S7:依次以标准节预制烟道为模板完成后续楼层的墙柱、楼板主结构施工;S8:顶层施工,将顶层预制烟道安装标准节预制烟道上;S9:顶层的墙柱、楼板主结构施工;S10:设置上翻混凝土结构。成型的墙柱和楼板直接与预制烟道的外壁面接触,保证连接处紧密结合,大大降低渗漏水现象的发生。
Prefabricated flue split-level installation construction method
The invention relates to a split-level installation construction method for a prefabricated flue. The method comprises the following steps that S1, a sunken groove is formed in a bottom plate of the first layer; s2, positioning and mounting the first section of prefabricated flue; s3, building a wall column template by taking two adjacent outer wall surfaces of the first section of prefabricated flue as templates, and building a floor template by taking the other two adjacent outer wall surfaces as templates; s4, concrete is poured; s5, a second layer is constructed, and the standard section prefabricated flue is installed on the first section prefabricated flue; s6, construction of wall columns and floor slab main structures of the second layer is completed; s7, main structure construction of wall columns and floor slabs of subsequent floors is completed with the standard knot prefabricated flue as a formwork in sequence; s8, top layer construction is conducted, and top layer prefabricated flues are installed on the standard knot prefabricated flues; s9, main structures of wall columns and floor slabs on the top layer are constructed; and S10, the upturning concrete structure is arranged. The formed wall columns and floor slabs directly make contact with the outer wall face of the prefabricated flue, it is guaranteed that the joints are tightly combined, and the water leakage phenomenon is greatly reduced.
本发明涉及一种预制烟道错层安装施工方法,包括以下步骤:S1:首层底板开设下陷凹槽;S2:首节预制烟道定位安装;S3:以首节预制烟道的相邻两外壁面为模板搭建墙柱模板,以另外两个相邻外壁面为模板搭建楼板模板;S4:浇筑混凝土;S5:第二层施工,将标准节预制烟道安装在首节预制烟道上;S6:完成第二层的墙柱、楼板主结构施工;S7:依次以标准节预制烟道为模板完成后续楼层的墙柱、楼板主结构施工;S8:顶层施工,将顶层预制烟道安装标准节预制烟道上;S9:顶层的墙柱、楼板主结构施工;S10:设置上翻混凝土结构。成型的墙柱和楼板直接与预制烟道的外壁面接触,保证连接处紧密结合,大大降低渗漏水现象的发生。
Prefabricated flue split-level installation construction method
一种预制烟道错层安装施工方法
ZHANG WEI (Autor:in) / LI XINXIN (Autor:in) / FAN YUJIANG (Autor:in) / HONG YANG (Autor:in) / SONG XUELEI (Autor:in)
11.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Installation and construction method for prefabricated flue of residential building
Europäisches Patentamt | 2022
|Prefabricated column installation construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Pipe gallery prefabricated installation construction method
Europäisches Patentamt | 2020
|Prefabricated building stair installation construction method
Europäisches Patentamt | 2020
|