Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Treatment method for soft foundation under strip-shaped foundation
The invention discloses a treatment method for a soft foundation under a strip-shaped foundation. The problems that a conventional treatment method is high in construction cost and long in construction period are solved. After the foundation pit is excavated to the elevation of a base, the foundation pit continues to be excavated downwards by 0.5 m; lime soil with the thickness of 30 cm is fully paved, graded broken stone is paved in the foundation contour line, the paving height is 50 cm, and paving of the graded broken stone needs to extend out of the foundation contour line by 30 cm; a road roller with the corresponding ton number is arranged, the graded broken stone layer formed in the third step is compacted, the graded broken stone layer and the 3: 7 lime soil layer in the second step are immersed into the soft soil layer below the 3: 7 lime soil layer, and the graded broken stone layer is compacted; a static load experiment is conducted on the completed base, and if the foundation bearing capacity obtained through the static load experiment meets the design requirement, a concrete strip-shaped foundation is constructed; the method has the advantages of being low in construction cost and short in construction period, and effective treatment of the soft foundation under the strip-shaped foundation is achieved.
本发明公开了一种条形基础下软弱地基的处理方法,解决了常规的处理方法存在施工成本高和施工周期长的问题;基坑开挖至基底标高后,继续向下开挖0.5米深;满铺30厘米厚的灰土,在基础轮廓线内摊铺级配碎石,摊铺高度为50厘米,级配碎石的摊铺要向基础轮廓线外延伸30厘米;配备相应吨数的压路机,对第三步形成的级配碎石层进行压实处理,使级配碎石层和第二步的3:7灰土层,没入其下的软弱土层中,并将级配碎石层压实;对完成的基底,进行静载实验,若静载实验得到的地基承载力已达到设计要求,进行混凝土条形基础的施作;本发明具有施工成本低,施工工期短的特点,实现了对条形基础下的软弱地基的有效处理。
Treatment method for soft foundation under strip-shaped foundation
The invention discloses a treatment method for a soft foundation under a strip-shaped foundation. The problems that a conventional treatment method is high in construction cost and long in construction period are solved. After the foundation pit is excavated to the elevation of a base, the foundation pit continues to be excavated downwards by 0.5 m; lime soil with the thickness of 30 cm is fully paved, graded broken stone is paved in the foundation contour line, the paving height is 50 cm, and paving of the graded broken stone needs to extend out of the foundation contour line by 30 cm; a road roller with the corresponding ton number is arranged, the graded broken stone layer formed in the third step is compacted, the graded broken stone layer and the 3: 7 lime soil layer in the second step are immersed into the soft soil layer below the 3: 7 lime soil layer, and the graded broken stone layer is compacted; a static load experiment is conducted on the completed base, and if the foundation bearing capacity obtained through the static load experiment meets the design requirement, a concrete strip-shaped foundation is constructed; the method has the advantages of being low in construction cost and short in construction period, and effective treatment of the soft foundation under the strip-shaped foundation is achieved.
本发明公开了一种条形基础下软弱地基的处理方法,解决了常规的处理方法存在施工成本高和施工周期长的问题;基坑开挖至基底标高后,继续向下开挖0.5米深;满铺30厘米厚的灰土,在基础轮廓线内摊铺级配碎石,摊铺高度为50厘米,级配碎石的摊铺要向基础轮廓线外延伸30厘米;配备相应吨数的压路机,对第三步形成的级配碎石层进行压实处理,使级配碎石层和第二步的3:7灰土层,没入其下的软弱土层中,并将级配碎石层压实;对完成的基底,进行静载实验,若静载实验得到的地基承载力已达到设计要求,进行混凝土条形基础的施作;本发明具有施工成本低,施工工期短的特点,实现了对条形基础下的软弱地基的有效处理。
Treatment method for soft foundation under strip-shaped foundation
一种条形基础下软弱地基的处理方法
YAN MINGGUANG (Autor:in) / CHENG XIAOFENG (Autor:in) / WANG BO (Autor:in) / GUO HUIFENG (Autor:in) / DONG TINGTING (Autor:in) / SHEN YAN (Autor:in) / SONG JIAN (Autor:in) / LI LU (Autor:in) / SU NING (Autor:in)
14.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Soft foundation treatment structure and soft foundation treatment method
Europäisches Patentamt | 2024
|Construction method for changing double-column independent foundation into strip-shaped foundation
Europäisches Patentamt | 2024
|Prefabricated prestressed strip-shaped reinforced concrete foundation
Europäisches Patentamt | 2021
|Soft foundation treatment method for derrick foundation
Europäisches Patentamt | 2023
|