Steel plate shear wall and mounting method thereof
According to the steel plate shear wall and the mounting method thereof, all the parts are prefabricated in a factory, field machining can be avoided, the machining precision can be improved, construction pollution can be reduced, and working hours and procedures can be saved; dry construction is adopted on site and is different from a traditional cement mortar treatment mode, and construction pollution is reduced; during site construction, firstly, the connecting piece is pre-welded to the U-shaped keel, then the whole is welded to the inner wall body of the steel structure according to the specified position, then the wood adapter piece is installed according to the position of the connecting piece, finally, the fastening piece is installed to fix the wood adapter piece, and finally the decoration panel is installed on the adapter piece. The overall structure is simple, installation is convenient and fast, the characteristics of assembly type fast assembly and disassembly are met, and compared with the prior art, the connecting strength is higher.
本发明的一种钢板剪力墙及其安装方法,其各部件在工厂预制,可避免现场加工,提高加工精度,减少施工污染,节省工时工序;现场采用干法施工,区别于传统的水泥砂浆处理方式,减少施工污染;现场施工时首先将连接件预焊在U型龙骨上,再按照规定位置将这一整体焊接在钢结构的内墙体上,随后将木质的转接件根据连接件的位置进行安装,最后安装紧固件将木质的转接件固定,最后将装饰面板安装到转接件上;其整体结构简单,安装便捷,满足装配式快装快拆的特点,并且相较于现有技术连接强度更高。
Steel plate shear wall and mounting method thereof
According to the steel plate shear wall and the mounting method thereof, all the parts are prefabricated in a factory, field machining can be avoided, the machining precision can be improved, construction pollution can be reduced, and working hours and procedures can be saved; dry construction is adopted on site and is different from a traditional cement mortar treatment mode, and construction pollution is reduced; during site construction, firstly, the connecting piece is pre-welded to the U-shaped keel, then the whole is welded to the inner wall body of the steel structure according to the specified position, then the wood adapter piece is installed according to the position of the connecting piece, finally, the fastening piece is installed to fix the wood adapter piece, and finally the decoration panel is installed on the adapter piece. The overall structure is simple, installation is convenient and fast, the characteristics of assembly type fast assembly and disassembly are met, and compared with the prior art, the connecting strength is higher.
本发明的一种钢板剪力墙及其安装方法,其各部件在工厂预制,可避免现场加工,提高加工精度,减少施工污染,节省工时工序;现场采用干法施工,区别于传统的水泥砂浆处理方式,减少施工污染;现场施工时首先将连接件预焊在U型龙骨上,再按照规定位置将这一整体焊接在钢结构的内墙体上,随后将木质的转接件根据连接件的位置进行安装,最后安装紧固件将木质的转接件固定,最后将装饰面板安装到转接件上;其整体结构简单,安装便捷,满足装配式快装快拆的特点,并且相较于现有技术连接强度更高。
Steel plate shear wall and mounting method thereof
一种钢板剪力墙及其安装方法
DING XINXIN (Autor:in) / WANG WENGUANG (Autor:in) / ZHOU DONGSHAN (Autor:in) / MA JIAHUAN (Autor:in) / CAI SHUAISHUAI (Autor:in)
14.07.2023
Patent
Elektronische Ressource
Chinesisch
Novel fabricated steel plate shear wall and mounting method thereof
Europäisches Patentamt | 2023
|Fabricated steel plate shear wall structure and mounting method
Europäisches Patentamt | 2023
|Inner arch type steel frame-combined steel plate shear wall and mounting method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Buckling-restrained steel plate shear wall and manufacturing method and mounting method thereof
Europäisches Patentamt | 2024
|