Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process of oversized impervious concrete pool
The invention relates to the field of sewage treatment, and particularly discloses a super-large anti-permeability concrete pool construction technology which comprises the following steps: S1, construction surveying and setting out; s2, paving and draining; s3, foundation pit earth excavation; s4, performing concrete engineering; s5, mounting a reinforced concrete drainage pipeline; s6, earthwork backfilling; s4, in concrete engineering, anti-seepage concrete is used for pouring the pool body; the impervious concrete is prepared from the following raw materials in parts by weight: 960-1080 parts of coarse aggregate, 730-810 parts of fine aggregate, 320-440 parts of a cementing material, 39-51 parts of an additive, 150-200 parts of water and 50-70 parts of a curing material, the curing material comprises a compacting agent and an absorption binding agent, and the weight ratio of the compacting agent to the absorption binding agent is (2-3): (3-4). The construction technology has the advantages that chloride ion permeation is reduced, and the service life of the pool is prolonged.
本申请涉及污水处理领域,具体公开了一种超大抗渗混凝土水池施工工艺,包括以下步骤:S1、施工测量放线;S2、铺路排水;S3、基坑土方开挖;S4、混凝土工程;S5、安装钢筋混凝土排水管道;S6、土方回填;S4混凝土工程为使用抗渗混凝土对水池主体进行浇筑;所述抗渗混凝土由包括以下重量份的原料组成:粗集料960~1080份,细集料730~810份,胶凝材料320~440份,外加剂39~51份,水150~200份,固化材料50~70份,所述固化材料包括密实剂和吸收结合剂,所述密实剂和吸收结合剂二者重量之比为(2~3):(3~4)。本申请的施工工艺具有减少氯离子渗透,延长水池寿命的优点。
Construction process of oversized impervious concrete pool
The invention relates to the field of sewage treatment, and particularly discloses a super-large anti-permeability concrete pool construction technology which comprises the following steps: S1, construction surveying and setting out; s2, paving and draining; s3, foundation pit earth excavation; s4, performing concrete engineering; s5, mounting a reinforced concrete drainage pipeline; s6, earthwork backfilling; s4, in concrete engineering, anti-seepage concrete is used for pouring the pool body; the impervious concrete is prepared from the following raw materials in parts by weight: 960-1080 parts of coarse aggregate, 730-810 parts of fine aggregate, 320-440 parts of a cementing material, 39-51 parts of an additive, 150-200 parts of water and 50-70 parts of a curing material, the curing material comprises a compacting agent and an absorption binding agent, and the weight ratio of the compacting agent to the absorption binding agent is (2-3): (3-4). The construction technology has the advantages that chloride ion permeation is reduced, and the service life of the pool is prolonged.
本申请涉及污水处理领域,具体公开了一种超大抗渗混凝土水池施工工艺,包括以下步骤:S1、施工测量放线;S2、铺路排水;S3、基坑土方开挖;S4、混凝土工程;S5、安装钢筋混凝土排水管道;S6、土方回填;S4混凝土工程为使用抗渗混凝土对水池主体进行浇筑;所述抗渗混凝土由包括以下重量份的原料组成:粗集料960~1080份,细集料730~810份,胶凝材料320~440份,外加剂39~51份,水150~200份,固化材料50~70份,所述固化材料包括密实剂和吸收结合剂,所述密实剂和吸收结合剂二者重量之比为(2~3):(3~4)。本申请的施工工艺具有减少氯离子渗透,延长水池寿命的优点。
Construction process of oversized impervious concrete pool
超大抗渗混凝土水池施工工艺
SONG BO (Autor:in) / SHEN PEI (Autor:in) / ZENG YI (Autor:in) / LIU TAO (Autor:in) / LIU HONGZHI (Autor:in) / LIU YAJING (Autor:in) / BAI BING (Autor:in) / HAN KAIXUE (Autor:in) / ZHAO CHUNYANG (Autor:in) / YU JIASHENG (Autor:in)
14.07.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Engineering Index Backfile | 1903
Engineering Index Backfile | 1903
|Construction process for impervious design concrete-based terrazzo ground
Europäisches Patentamt | 2021
|