Method for splicing track panel of concrete-filled steel tube sleeper type ballastless track
The invention discloses a concrete filled steel tube sleeper type ballastless track panel assembling method, which belongs to the technical field of track traffic engineering, and comprises the following steps: marking mounting hole positions on two sides of a sleeper unit, and marking grabbing point positions on steel tubes of the sleeper unit; a sleeper unit placing position is marked on the ground; grabbing a steel pipe of the sleeper unit, and grabbing the sleeper unit to a placing position of the sleeper unit; connecting rods are placed in the longitudinal direction, and the adjacent sleeper units are connected through the connecting rods; and side face track panel connecting rods are installed on the two sides of the sleeper units and inserted into the installing hole sites in the two sides of the sleeper units, and the track panel side face connecting rods connect the sleeper units to form the track panel. According to the track panel assembling device, in the track panel assembling process, placing of the sleeper units, grabbing of the sleeper units, connection of the side face track panel connecting rods on the two sides of the sleeper units and the like are all set to be in an identifiable mode, so that full automation of track panel assembling can be achieved through a mechanical arm and the like subsequently, and the assembling quality and the assembling efficiency of track panels can be greatly improved.
本发明公开了一种钢管混凝土枕式无砟轨道轨排拼装方法,属于轨道交通工程技术领域,包括在轨枕单元的两侧标记安装孔位,在轨枕单元的钢管上标记抓取点位;在地面标记轨枕单元放置位置;抓取轨枕单元的钢管,将轨枕单元抓取至轨枕单元的放置位置;沿纵向放置连接杆,连接杆将相邻轨枕单元连接;在轨枕单元两侧安装侧面轨排连杆,侧面轨排连杆插入轨枕单元两侧的安装孔位内,轨排侧面连杆将各轨枕单元连接形成轨排。本申请将轨排拼装过程中轨枕单元的放置、轨枕单元的抓取以及轨枕单元两侧的侧面轨排连杆的连接等均设置为可识别形式,以便于后续采用机械臂等实现轨排拼装的全自动化,可大幅提高轨排的组装质量和组装效率。
Method for splicing track panel of concrete-filled steel tube sleeper type ballastless track
The invention discloses a concrete filled steel tube sleeper type ballastless track panel assembling method, which belongs to the technical field of track traffic engineering, and comprises the following steps: marking mounting hole positions on two sides of a sleeper unit, and marking grabbing point positions on steel tubes of the sleeper unit; a sleeper unit placing position is marked on the ground; grabbing a steel pipe of the sleeper unit, and grabbing the sleeper unit to a placing position of the sleeper unit; connecting rods are placed in the longitudinal direction, and the adjacent sleeper units are connected through the connecting rods; and side face track panel connecting rods are installed on the two sides of the sleeper units and inserted into the installing hole sites in the two sides of the sleeper units, and the track panel side face connecting rods connect the sleeper units to form the track panel. According to the track panel assembling device, in the track panel assembling process, placing of the sleeper units, grabbing of the sleeper units, connection of the side face track panel connecting rods on the two sides of the sleeper units and the like are all set to be in an identifiable mode, so that full automation of track panel assembling can be achieved through a mechanical arm and the like subsequently, and the assembling quality and the assembling efficiency of track panels can be greatly improved.
本发明公开了一种钢管混凝土枕式无砟轨道轨排拼装方法,属于轨道交通工程技术领域,包括在轨枕单元的两侧标记安装孔位,在轨枕单元的钢管上标记抓取点位;在地面标记轨枕单元放置位置;抓取轨枕单元的钢管,将轨枕单元抓取至轨枕单元的放置位置;沿纵向放置连接杆,连接杆将相邻轨枕单元连接;在轨枕单元两侧安装侧面轨排连杆,侧面轨排连杆插入轨枕单元两侧的安装孔位内,轨排侧面连杆将各轨枕单元连接形成轨排。本申请将轨排拼装过程中轨枕单元的放置、轨枕单元的抓取以及轨枕单元两侧的侧面轨排连杆的连接等均设置为可识别形式,以便于后续采用机械臂等实现轨排拼装的全自动化,可大幅提高轨排的组装质量和组装效率。
Method for splicing track panel of concrete-filled steel tube sleeper type ballastless track
一种钢管混凝土枕式无砟轨道轨排拼装方法
ZHANG ZHENG (Autor:in) / LI QIUYI (Autor:in) / LI LUYAO (Autor:in) / YANG ZHOU (Autor:in) / ZHU BIN (Autor:in) / ZHANG SHIJIE (Autor:in) / YE SONG (Autor:in) / WEI HEDAO (Autor:in) / LIU HUIFANG (Autor:in) / ZHANG ZE (Autor:in)
21.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Concrete filled steel tube sleeper for ballastless track
Europäisches Patentamt | 2023
|Adjustable concrete filled steel tube sleeper type ballastless track and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Concrete-filled steel tube sleeper type ballastless track and construction method thereof
Europäisches Patentamt | 2020
|Overall replacement method for concrete filled steel tube sleeper type ballastless track bed