Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process of high-strength prestressed concrete pile in soft soil area
The invention provides a soft soil area high-strength prestressed concrete pile construction technology, and relates to the technical field of concrete pile construction, the soft soil area high-strength prestressed concrete pile construction technology comprises the following steps: S1, a pretreatment procedure: positioning and pretreating a construction range; and S2, an auxiliary process: designing and manufacturing a corresponding auxiliary tool positioning point through the design drawing, setting a corresponding auxiliary tool at the tool positioning point, and assisting the setting through the auxiliary tool. The moving direction of the moving ends of the rails is flush with the horizontal plane, a push plate is arranged between the moving ends of the two rails, the top of the push plate makes contact with the top of soil in the construction range, soil is arranged in the moving direction of the push plate, the push plate can drive the soil to move when pushed, and the soil can fall into the concave surface when passing through the concave surface; when the push plate passes through the convex surface, the push plate is blocked, at the moment, the convex surface is leveled in a shoveling mode, the leveled height is attached to the bottom of the push plate, and then the concave surface is tamped.
本发明提供软土地区高强预应力混凝土桩施工工艺,涉及混凝土桩施工技术领域,包括以下步骤:S1、预处理工序,对施工范围进行定位和预处理;S2、辅助工序,通过设计图纸设计制作好相对应的辅助工具定位点,同时在工具定位点设置对应的辅助工具,并且通过辅助工具辅佐设置。本发明,通过轨道移动端移动方向与水平面持平,两个轨道的移动端之间设置有推板,推板的顶部与施工范围的土壤顶部相接触,推板的移动方向设置有土壤,推板推动时会带动土壤移动,而土壤在经过凹面时,会掉入凹面内部,而推板经过凸面时,则会被阻拦,此时通过铲除的方式将凸面铲平,且铲平之后的高度与推板的底部相贴附,之后对凹面进行夯实工作。
Construction process of high-strength prestressed concrete pile in soft soil area
The invention provides a soft soil area high-strength prestressed concrete pile construction technology, and relates to the technical field of concrete pile construction, the soft soil area high-strength prestressed concrete pile construction technology comprises the following steps: S1, a pretreatment procedure: positioning and pretreating a construction range; and S2, an auxiliary process: designing and manufacturing a corresponding auxiliary tool positioning point through the design drawing, setting a corresponding auxiliary tool at the tool positioning point, and assisting the setting through the auxiliary tool. The moving direction of the moving ends of the rails is flush with the horizontal plane, a push plate is arranged between the moving ends of the two rails, the top of the push plate makes contact with the top of soil in the construction range, soil is arranged in the moving direction of the push plate, the push plate can drive the soil to move when pushed, and the soil can fall into the concave surface when passing through the concave surface; when the push plate passes through the convex surface, the push plate is blocked, at the moment, the convex surface is leveled in a shoveling mode, the leveled height is attached to the bottom of the push plate, and then the concave surface is tamped.
本发明提供软土地区高强预应力混凝土桩施工工艺,涉及混凝土桩施工技术领域,包括以下步骤:S1、预处理工序,对施工范围进行定位和预处理;S2、辅助工序,通过设计图纸设计制作好相对应的辅助工具定位点,同时在工具定位点设置对应的辅助工具,并且通过辅助工具辅佐设置。本发明,通过轨道移动端移动方向与水平面持平,两个轨道的移动端之间设置有推板,推板的顶部与施工范围的土壤顶部相接触,推板的移动方向设置有土壤,推板推动时会带动土壤移动,而土壤在经过凹面时,会掉入凹面内部,而推板经过凸面时,则会被阻拦,此时通过铲除的方式将凸面铲平,且铲平之后的高度与推板的底部相贴附,之后对凹面进行夯实工作。
Construction process of high-strength prestressed concrete pile in soft soil area
软土地区高强预应力混凝土桩施工工艺
YU JIANCHAO (Autor:in) / ZHANG LEI (Autor:in) / YUE JINGFANG (Autor:in) / HUANG JIANG (Autor:in) / TONG GANG (Autor:in) / LIU PENGSHUAI (Autor:in) / ZHANG YUN (Autor:in) / HUANG XIAO (Autor:in) / WANG WEI (Autor:in) / QIAN CHENG (Autor:in)
25.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-strength prestressed concrete square pile construction technology
Europäisches Patentamt | 2022
|Deep soft soil high-strength prestressed pipe pile hammer piling construction method
Europäisches Patentamt | 2015
|Prestressed high-strength concrete pipe pile guide hole pile planting construction method
Europäisches Patentamt | 2024
|