Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underground diaphragm wall gravel backfilling device and backfilling construction method
The invention discloses an underground diaphragm wall gravel backfilling device and a backfilling construction method thereof. The underground diaphragm wall gravel backfilling device comprises a loading frame, a feeding structure used for conveying backfilled gravel and a groove entering funnel arranged at the position corresponding to a groove opening of an underground diaphragm wall groove section. The loading frame comprises a supporting frame and a discharging hopper arranged on the supporting frame, and the feeding structure is arranged between the discharging hopper and the groove entering hopper. The broken stone backfilling device can automatically backfill within a certain time interval, the backfilling speed is high, continuous work can be achieved, accidental time possibly triggered when workers participate in backfilling is avoided, and the backfilling efficiency can be guaranteed; the broken stone backfilling device is used for replacing a traditional broken stone backfilling means, the labor cost can be greatly reduced, the construction efficiency is improved, the broken stone backfilling quality is improved, the construction risk is reduced, the applicability is high, and positive significance is achieved for optimizing underground diaphragm wall construction.
本发明公开了一种地连墙碎石回填装置及其回填施工方法,其装置包括装载架、用来传送回填碎石的送料结构以及用于对应地连墙槽段槽口处设置的入槽漏斗;所述装载架包括支撑架和设在支撑架上的下料漏斗,所述送料结构设置在下料漏斗和入槽漏斗之间。碎石回填装置可在一定时间区间内自动回填,其回填速率高而且可连续工作,避免了人工参与回填时可能触发的偶发性时间,回填效率可得到保障;即通过碎石回填装置代替传统的碎石回填手段,可极大地缩减人力成本,提高施工效率,改善碎石回填质量,降低施工风险,且适用性强,对于优化地连墙施工具有积极意义。
Underground diaphragm wall gravel backfilling device and backfilling construction method
The invention discloses an underground diaphragm wall gravel backfilling device and a backfilling construction method thereof. The underground diaphragm wall gravel backfilling device comprises a loading frame, a feeding structure used for conveying backfilled gravel and a groove entering funnel arranged at the position corresponding to a groove opening of an underground diaphragm wall groove section. The loading frame comprises a supporting frame and a discharging hopper arranged on the supporting frame, and the feeding structure is arranged between the discharging hopper and the groove entering hopper. The broken stone backfilling device can automatically backfill within a certain time interval, the backfilling speed is high, continuous work can be achieved, accidental time possibly triggered when workers participate in backfilling is avoided, and the backfilling efficiency can be guaranteed; the broken stone backfilling device is used for replacing a traditional broken stone backfilling means, the labor cost can be greatly reduced, the construction efficiency is improved, the broken stone backfilling quality is improved, the construction risk is reduced, the applicability is high, and positive significance is achieved for optimizing underground diaphragm wall construction.
本发明公开了一种地连墙碎石回填装置及其回填施工方法,其装置包括装载架、用来传送回填碎石的送料结构以及用于对应地连墙槽段槽口处设置的入槽漏斗;所述装载架包括支撑架和设在支撑架上的下料漏斗,所述送料结构设置在下料漏斗和入槽漏斗之间。碎石回填装置可在一定时间区间内自动回填,其回填速率高而且可连续工作,避免了人工参与回填时可能触发的偶发性时间,回填效率可得到保障;即通过碎石回填装置代替传统的碎石回填手段,可极大地缩减人力成本,提高施工效率,改善碎石回填质量,降低施工风险,且适用性强,对于优化地连墙施工具有积极意义。
Underground diaphragm wall gravel backfilling device and backfilling construction method
一种地连墙碎石回填装置及回填施工方法
ZHAO FENG (Autor:in) / XIA HUAN (Autor:in) / ZENG XUTAO (Autor:in) / ZHONG YONGXIN (Autor:in) / WANG TONG (Autor:in) / ZHOU YANPING (Autor:in) / FU JINLEI (Autor:in) / DAI JUNPING (Autor:in) / RUAN JING (Autor:in) / LUO HUIDONG (Autor:in)
25.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deep water area cofferdam backfilling device and backfilling construction method thereof
Europäisches Patentamt | 2024
|Seabed gravel backfilling device and using method thereof
Europäisches Patentamt | 2023
|Back backfilling tool for diaphragm wall I-steel joint
Europäisches Patentamt | 2024
|