Construction process for main body structure of buried sewage treatment plant
The invention relates to a construction process for a main body structure of a buried sewage treatment plant, and relates to the technical field of construction of buried sewage treatment plants. Comprising the following steps: pre-paving and anti-sticking construction of a TPO high-molecular waterproof coiled material: paving the waterproof coiled material coated with a TPO high-molecular self-sticking adhesive film layer on a base surface, and pouring structural concrete, so that concrete slurry is tightly combined with the coiled material adhesive film layer; non-parting construction of a super-large and super-long concrete structure in a buried sewage treatment plant is conducted, specifically, an interval concrete pouring construction method is adopted, and follow-up anti-floating anchor rod construction, waterproof construction and main body structure construction are conducted in a block-by-block mode; and construction of a plate buckle type scaffold supporting system: a high formwork support body adopts a plate buckle type steel pipe scaffold, and a beam support and a top plate full space supporting frame are erected by utilizing the functions that vertical rods are lengthened at will, upper and lower bottom supports are adjustable in jacking and a unit structure extends infinitely. The TPO polymer waterproof roll and the main body structure are integrated, the waterproof performance is not affected by settlement of the main body structure, and underground water permeation is effectively prevented.
本发明关于一种地埋式污水处理厂主体结构施工工艺,涉及地埋式污水处理厂建设技术领域。包括TPO高分子防水卷材预铺反粘施工:将覆有TPO高分子自粘胶膜层的防水卷材空铺在基面上,浇筑结构混凝土,使混凝土浆料与卷材胶膜层紧密结合;地埋式污水处理厂中超大超长混凝土结构不分缝施工:采用间隔浇筑混凝土施工工法,分区块进行后续的抗浮锚杆、防水及主体结构施工;盘扣式脚手架支撑体系施工:高支模架体采用盘扣式钢管脚手架,利用立杆任意接长、上下底托顶托可调、单元结构无限延伸的功能,搭设梁支架与顶板满堂支撑架。本发明将TPO高分子防水卷材与主体结构融为一体,防水性能不受主体结构沉降影响,有效地防止地下水渗入。
Construction process for main body structure of buried sewage treatment plant
The invention relates to a construction process for a main body structure of a buried sewage treatment plant, and relates to the technical field of construction of buried sewage treatment plants. Comprising the following steps: pre-paving and anti-sticking construction of a TPO high-molecular waterproof coiled material: paving the waterproof coiled material coated with a TPO high-molecular self-sticking adhesive film layer on a base surface, and pouring structural concrete, so that concrete slurry is tightly combined with the coiled material adhesive film layer; non-parting construction of a super-large and super-long concrete structure in a buried sewage treatment plant is conducted, specifically, an interval concrete pouring construction method is adopted, and follow-up anti-floating anchor rod construction, waterproof construction and main body structure construction are conducted in a block-by-block mode; and construction of a plate buckle type scaffold supporting system: a high formwork support body adopts a plate buckle type steel pipe scaffold, and a beam support and a top plate full space supporting frame are erected by utilizing the functions that vertical rods are lengthened at will, upper and lower bottom supports are adjustable in jacking and a unit structure extends infinitely. The TPO polymer waterproof roll and the main body structure are integrated, the waterproof performance is not affected by settlement of the main body structure, and underground water permeation is effectively prevented.
本发明关于一种地埋式污水处理厂主体结构施工工艺,涉及地埋式污水处理厂建设技术领域。包括TPO高分子防水卷材预铺反粘施工:将覆有TPO高分子自粘胶膜层的防水卷材空铺在基面上,浇筑结构混凝土,使混凝土浆料与卷材胶膜层紧密结合;地埋式污水处理厂中超大超长混凝土结构不分缝施工:采用间隔浇筑混凝土施工工法,分区块进行后续的抗浮锚杆、防水及主体结构施工;盘扣式脚手架支撑体系施工:高支模架体采用盘扣式钢管脚手架,利用立杆任意接长、上下底托顶托可调、单元结构无限延伸的功能,搭设梁支架与顶板满堂支撑架。本发明将TPO高分子防水卷材与主体结构融为一体,防水性能不受主体结构沉降影响,有效地防止地下水渗入。
Construction process for main body structure of buried sewage treatment plant
一种地埋式污水处理厂主体结构施工工艺
DU YOUXIU (Autor:in) / CHENG JIANG (Autor:in) / NIU CHAO (Autor:in) / YANG JIE (Autor:in) / DU XIAOWEI (Autor:in) / YANG JING (Autor:in) / SHAN YUNQIANG (Autor:in) / LEE JIN-WOOK (Autor:in) / ZHANG RONG (Autor:in) / ZHANG WENSHENG (Autor:in)
25.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Waterproof concrete interval pouring construction method for buried sewage treatment plant
Europäisches Patentamt | 2023
|Temporary water system pre-buried in main body structure and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|