Foundation pit engineering construction method
The invention provides a foundation pit engineering construction method, and belongs to the technical field of municipal engineering. The foundation pit engineering construction method comprises the steps that S1, construction preparation is conducted; s2, construction guarantee; s3, monitoring and controlling; s4, construction management and worker allocation and labor division; s5, matching with related units; s6, supporting pile construction; s7, earthwork construction is conducted; s8, performing project acceptance; s9, emergency treatment measures are taken; and S10, transferring for completion. In use, after construction is completed, temporary facilities are dismantled and transferred to a construction general contract unit for re-planning; according to the foundation pit engineering construction method, the safety of the foundation pit, adjacent buildings, roads around the foundation pit and adjacent underground pipelines is ensured through monitoring, dynamic changes of a supporting system and the surrounding environment can be mastered, construction is guided through information obtained through detection, and the construction efficiency is improved. The construction process is scientific and informationized, the occurrence rate of accidents is reduced, and normal completion is ensured.
本发明提供了一种基坑工程施工方法,属于市政工程技术领域。该基坑工程施工方法包括S1:施工准备;S2:施工保证;S3:监测监控;S4:施工管理及作业人员配备和分工;S5:与相关单位配合;S6:支护桩施工;S7:土方施工;S8:项目验收;S9:应急处置措施;S10:竣工移交。使用时,施工完成后,拆除临时设施,移交施工总承包单位进行重新规划;基坑移交给后续单位进行下道工序施工,该基坑工程施工方法通过监测监控确保基坑本身及邻近建筑物、基坑周边道路和邻近地下管线的安全,可以掌握支护系统及周围环境动态变化,应用检测所得的信息指导施工,是施工过程科学化、信息化,降低了事故的发生率,确保可以正常完工。
Foundation pit engineering construction method
The invention provides a foundation pit engineering construction method, and belongs to the technical field of municipal engineering. The foundation pit engineering construction method comprises the steps that S1, construction preparation is conducted; s2, construction guarantee; s3, monitoring and controlling; s4, construction management and worker allocation and labor division; s5, matching with related units; s6, supporting pile construction; s7, earthwork construction is conducted; s8, performing project acceptance; s9, emergency treatment measures are taken; and S10, transferring for completion. In use, after construction is completed, temporary facilities are dismantled and transferred to a construction general contract unit for re-planning; according to the foundation pit engineering construction method, the safety of the foundation pit, adjacent buildings, roads around the foundation pit and adjacent underground pipelines is ensured through monitoring, dynamic changes of a supporting system and the surrounding environment can be mastered, construction is guided through information obtained through detection, and the construction efficiency is improved. The construction process is scientific and informationized, the occurrence rate of accidents is reduced, and normal completion is ensured.
本发明提供了一种基坑工程施工方法,属于市政工程技术领域。该基坑工程施工方法包括S1:施工准备;S2:施工保证;S3:监测监控;S4:施工管理及作业人员配备和分工;S5:与相关单位配合;S6:支护桩施工;S7:土方施工;S8:项目验收;S9:应急处置措施;S10:竣工移交。使用时,施工完成后,拆除临时设施,移交施工总承包单位进行重新规划;基坑移交给后续单位进行下道工序施工,该基坑工程施工方法通过监测监控确保基坑本身及邻近建筑物、基坑周边道路和邻近地下管线的安全,可以掌握支护系统及周围环境动态变化,应用检测所得的信息指导施工,是施工过程科学化、信息化,降低了事故的发生率,确保可以正常完工。
Foundation pit engineering construction method
一种基坑工程施工方法
CAI TIANFEI (Autor:in) / SHI MINGWEI (Autor:in) / LIU YU (Autor:in)
28.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction engineering foundation pit slope pile foundation on-site construction method
Europäisches Patentamt | 2022
|Construction engineering foundation pile detection method
Europäisches Patentamt | 2023
|