Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation engineering construction machine
The invention relates to a foundation engineering construction machine, and relates to the field of house building foundation construction, the foundation engineering construction machine comprises a vehicle body and a material hopper used for containing concrete, the material hopper is installed on the vehicle body, and a discharging hose used for discharging the concrete is arranged on the vehicle body; a connecting pipe used for adding concrete into the discharging hose is arranged between the material hopper and the discharging hose, a driving mechanism used for driving the discharging hose to be lowered or lifted is installed on the vehicle body, a vibrator is installed on the vehicle body, a vibrating pipe is fixedly connected and communicated with the vibrator, and the vibrating pipe is connected with the material hopper. The vibrating pipe is arranged in the length direction of the discharging hose, and a first transmission assembly used for recycling the vibrating pipe or lowering the vibrating pipe is installed on the vehicle body. The construction method has the effect of improving the construction efficiency of the concrete foundation pile.
本申请涉及一种地基基础工程施工建造机械,涉及房建地基施工建造领域,其包括车体和用于盛放混凝土的物料斗,所述物料斗安装在所述车体上,所述车体上设有用于下放混凝土的下料软管,所述物料斗与所述下料软管之间设有用于向所述下料软管添加混凝土的连接管,所述车体上安装有用于驱动下料软管进行下放或上提的驱动机构,所述车体上安装有振捣器,所述振捣器上固接并连通有振捣管,所述振捣管沿所述下料软管的长度方向设置,所述车体上安装有用于回收所述振捣管或下放所述振捣管的第一传动组件。本申请具有提高混凝土基桩的建设效率的效果。
Foundation engineering construction machine
The invention relates to a foundation engineering construction machine, and relates to the field of house building foundation construction, the foundation engineering construction machine comprises a vehicle body and a material hopper used for containing concrete, the material hopper is installed on the vehicle body, and a discharging hose used for discharging the concrete is arranged on the vehicle body; a connecting pipe used for adding concrete into the discharging hose is arranged between the material hopper and the discharging hose, a driving mechanism used for driving the discharging hose to be lowered or lifted is installed on the vehicle body, a vibrator is installed on the vehicle body, a vibrating pipe is fixedly connected and communicated with the vibrator, and the vibrating pipe is connected with the material hopper. The vibrating pipe is arranged in the length direction of the discharging hose, and a first transmission assembly used for recycling the vibrating pipe or lowering the vibrating pipe is installed on the vehicle body. The construction method has the effect of improving the construction efficiency of the concrete foundation pile.
本申请涉及一种地基基础工程施工建造机械,涉及房建地基施工建造领域,其包括车体和用于盛放混凝土的物料斗,所述物料斗安装在所述车体上,所述车体上设有用于下放混凝土的下料软管,所述物料斗与所述下料软管之间设有用于向所述下料软管添加混凝土的连接管,所述车体上安装有用于驱动下料软管进行下放或上提的驱动机构,所述车体上安装有振捣器,所述振捣器上固接并连通有振捣管,所述振捣管沿所述下料软管的长度方向设置,所述车体上安装有用于回收所述振捣管或下放所述振捣管的第一传动组件。本申请具有提高混凝土基桩的建设效率的效果。
Foundation engineering construction machine
一种地基基础工程施工建造机械
ZHANG YU (Autor:in) / FU FENGTAO (Autor:in) / WEN WENZHAO (Autor:in) / YIN CHANGHAI (Autor:in) / SUN JIANSHENG (Autor:in) / ZHOU LINA (Autor:in)
02.01.2024
Patent
Elektronische Ressource
Chinesisch
Building engineering house construction foundation concrete pouring machine
Europäisches Patentamt | 2021
|Pile foundation construction auxiliary device for foundation engineering
Europäisches Patentamt | 2023
|