Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated floor composite beam connecting structure and prefabricated floor composite beam connecting construction method
The invention relates to the technical field of buildings, in particular to a prefabricated floor composite beam connecting structure and a prefabricated floor composite beam connecting construction method.The prefabricated floor composite beam connecting structure comprises a prefabricated floor, a composite beam and connecting steel bars, and the composite beam comprises a prefabricated main body and a pouring main body which are connected with each other; the connecting side face of the prefabricated floor slab is attached to the pouring body, the prefabricated floor slab comprises a floor slab body, connecting sleeves and embedded steel bars, the connecting sleeves and the embedded steel bars extend in the third direction, the connecting sleeves and the embedded steel bars are embedded in the floor slab body, and the connecting sleeves are exposed by the connecting side face. One part of the connecting steel bar can extend into the connecting sleeve, and the other part of the connecting steel bar is embedded in the pouring main body. According to the prefabricated floor slab and composite beam connecting structure and the prefabricated floor slab and composite beam connecting construction method, the prefabricated floor slab and the prefabricated main body are not provided with steel bars exposed to the outside, and transportation and hoisting of the prefabricated floor slab and the prefabricated main body of the composite beam are facilitated.
本申请涉及建筑技术领域,尤其是涉及一种预制楼板组合梁连接结构及预制楼板组合梁连接施工方法,预制楼板组合梁连接结构包括预制楼板、组合梁和连接钢筋,组合梁包括彼此连接的预制主体和浇筑主体,且预制楼板的连接侧面与浇筑主体贴合设置,预制楼板包括楼板主体、连接套筒和预埋钢筋,连接套筒和预埋钢筋均沿第三方向延伸,且连接套筒和预埋钢筋均埋设于楼板主体内,连接套筒被连接侧面暴露。连接钢筋的一部分能够伸入连接套筒,连接钢筋另一部分埋设于浇筑主体内。根据本申请提供的预制楼板组合梁连接结构及预制楼板组合梁连接施工方法,不论预制楼板还是预制主体均没有暴露在外部的钢筋,方便了预制楼板和组合梁的预制主体的运输和吊运。
Prefabricated floor composite beam connecting structure and prefabricated floor composite beam connecting construction method
The invention relates to the technical field of buildings, in particular to a prefabricated floor composite beam connecting structure and a prefabricated floor composite beam connecting construction method.The prefabricated floor composite beam connecting structure comprises a prefabricated floor, a composite beam and connecting steel bars, and the composite beam comprises a prefabricated main body and a pouring main body which are connected with each other; the connecting side face of the prefabricated floor slab is attached to the pouring body, the prefabricated floor slab comprises a floor slab body, connecting sleeves and embedded steel bars, the connecting sleeves and the embedded steel bars extend in the third direction, the connecting sleeves and the embedded steel bars are embedded in the floor slab body, and the connecting sleeves are exposed by the connecting side face. One part of the connecting steel bar can extend into the connecting sleeve, and the other part of the connecting steel bar is embedded in the pouring main body. According to the prefabricated floor slab and composite beam connecting structure and the prefabricated floor slab and composite beam connecting construction method, the prefabricated floor slab and the prefabricated main body are not provided with steel bars exposed to the outside, and transportation and hoisting of the prefabricated floor slab and the prefabricated main body of the composite beam are facilitated.
本申请涉及建筑技术领域,尤其是涉及一种预制楼板组合梁连接结构及预制楼板组合梁连接施工方法,预制楼板组合梁连接结构包括预制楼板、组合梁和连接钢筋,组合梁包括彼此连接的预制主体和浇筑主体,且预制楼板的连接侧面与浇筑主体贴合设置,预制楼板包括楼板主体、连接套筒和预埋钢筋,连接套筒和预埋钢筋均沿第三方向延伸,且连接套筒和预埋钢筋均埋设于楼板主体内,连接套筒被连接侧面暴露。连接钢筋的一部分能够伸入连接套筒,连接钢筋另一部分埋设于浇筑主体内。根据本申请提供的预制楼板组合梁连接结构及预制楼板组合梁连接施工方法,不论预制楼板还是预制主体均没有暴露在外部的钢筋,方便了预制楼板和组合梁的预制主体的运输和吊运。
Prefabricated floor composite beam connecting structure and prefabricated floor composite beam connecting construction method
预制楼板组合梁连接结构及预制楼板组合梁连接施工方法
GAO XIAOLONG (Autor:in) / LIU TIYI (Autor:in) / LOU ZHANSHI (Autor:in) / ZHANG YONGCHANG (Autor:in) / LI BAOLING (Autor:in) / QIU HAO (Autor:in) / WANG MENGLONG (Autor:in)
28.07.2023
Patent
Elektronische Ressource
Chinesisch
Prefabricated floor composite beam connecting structure
Europäisches Patentamt | 2024
|Prefabricated floor beam connecting structure and connecting method
Europäisches Patentamt | 2023
|Prefabricated floor beam connecting structure and method thereof
Europäisches Patentamt | 2024
|Steel beam and prefabricated floor connecting structure and construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|