Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the field of building construction technologies, in particular to a building decoration engineering outer wall construction treatment technology which comprises the following steps that S1, a plurality of outer wall treatment modules are customized in advance according to the size of an outer wall face needing to be treated; s2, the wall face of the outer wall is cleaned and dried; s3, the inner surface of the connecting plate is brushed with building glue, and then the outer wall processing module is bonded to the outer wall surface; s4, the multiple outer wall treatment modules are sequentially arranged on the outer wall surface through building glue, and then seams between the outer wall treatment modules are tamped and flattened through seam glue; s5, coating is brushed on the joint glue, and screeding is conducted after coating is brushed; and S6, after all the gaps are processed, the protective stickers are torn down. The outer wall processing modules can be directly adhered to the outer wall surface through building glue, a large amount of time is saved, the multiple outer wall processing modules are of an integral structure from the appearance, the processing efficiency is improved, and meanwhile the attractiveness is guaranteed.
本发明涉及建筑施工工艺领域,具体为一种建筑装潢工程外墙施工处理工艺,其包括以下步骤:S1、根据需要处理的外墙墙面尺寸,预先订制多个外墙处理模块;S2、对外墙墙面进行清洁干燥;S3、在连接板内表面刷涂建筑胶水,然后将外墙处理模块粘接到外墙墙面上;S4、将多个外墙处理模块依次通过建筑胶水布置到外墙墙面上,然后通过接缝胶水将外墙处理模块之间的缝填实并抹平;S5、在接缝胶水上刷涂涂料,刷完涂料后进行抹平;S6、所有缝隙处理完毕后,撕下防护贴纸。本发明可以直接通过建筑胶水将外墙处理模块粘到外墙墙面上,节省了大量时间,且多个外墙处理模块从外形看为一个整体结构,提高处理效率的同时保证了美观性。
The invention relates to the field of building construction technologies, in particular to a building decoration engineering outer wall construction treatment technology which comprises the following steps that S1, a plurality of outer wall treatment modules are customized in advance according to the size of an outer wall face needing to be treated; s2, the wall face of the outer wall is cleaned and dried; s3, the inner surface of the connecting plate is brushed with building glue, and then the outer wall processing module is bonded to the outer wall surface; s4, the multiple outer wall treatment modules are sequentially arranged on the outer wall surface through building glue, and then seams between the outer wall treatment modules are tamped and flattened through seam glue; s5, coating is brushed on the joint glue, and screeding is conducted after coating is brushed; and S6, after all the gaps are processed, the protective stickers are torn down. The outer wall processing modules can be directly adhered to the outer wall surface through building glue, a large amount of time is saved, the multiple outer wall processing modules are of an integral structure from the appearance, the processing efficiency is improved, and meanwhile the attractiveness is guaranteed.
本发明涉及建筑施工工艺领域,具体为一种建筑装潢工程外墙施工处理工艺,其包括以下步骤:S1、根据需要处理的外墙墙面尺寸,预先订制多个外墙处理模块;S2、对外墙墙面进行清洁干燥;S3、在连接板内表面刷涂建筑胶水,然后将外墙处理模块粘接到外墙墙面上;S4、将多个外墙处理模块依次通过建筑胶水布置到外墙墙面上,然后通过接缝胶水将外墙处理模块之间的缝填实并抹平;S5、在接缝胶水上刷涂涂料,刷完涂料后进行抹平;S6、所有缝隙处理完毕后,撕下防护贴纸。本发明可以直接通过建筑胶水将外墙处理模块粘到外墙墙面上,节省了大量时间,且多个外墙处理模块从外形看为一个整体结构,提高处理效率的同时保证了美观性。
Building decoration project outer wall construction treatment process
一种建筑装潢工程外墙施工处理工艺
01.08.2023
Patent
Elektronische Ressource
Chinesisch
Building outer wall decoration engineering construction method
Europäisches Patentamt | 2023
|Novel heat preservation decoration construction process for building outer wall
Europäisches Patentamt | 2021
|Building curtain wall outer wall decoration operation construction equipment
Europäisches Patentamt | 2022
|Building thermal insulation outer wall decoration construction method
Europäisches Patentamt | 2021
|