Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete transporting and pouring equipment and method for rail transit inspection pit construction
The invention discloses concrete transporting and pouring equipment for rail transit inspection pit construction, which is characterized by comprising a movable discharging trolley and a start-stop overturn-preventing mechanism, the start-stop overturn-preventing mechanism comprises a locking assembly, a pulley assembly and a rail clamp, and the pulley assembly comprises a sector plate and an overturn-preventing pulley; the rail clamp is installed between the two sector plates in a hinged mode, the locking assembly comprises a main body frame, a pressing rod and a rotating disc assembly, and splayed pressing claws are arranged at the two ends of the pressing rod; the invention further discloses a concrete transporting and pouring method for construction of the rail transit inspection pit. The concrete transporting and pouring method comprises the following steps that S1, the steel rails are erected on a design path by means of the steel rail supporting door frame; s2, a constructor rotates a rotary disc assembly to enable a rail clamp to clamp the steel rail; s3, concrete is poured into the movable discharging trolley; the construction method has the advantages that construction is convenient and efficient, the operation difficulty is low, and the movable discharging trolley is stable in starting and stopping.
本发明公开了一种轨道交通检查坑施工的混凝土运输浇筑设备,其特征在于:包括可移动出料小车和启停防倾覆机构,启停防倾覆机构包括锁紧组件、滑轮组件和夹轨钳,滑轮组件包括扇形板和防倾覆滑轮,夹轨钳铰接安装在两个扇形板之间,锁紧组件包括主体框架、压紧杆和转盘组件,压紧杆两端设有“八”字型压爪;本发明还公开了一种轨道交通检查坑施工的混凝土运输浇筑方法,包括以下步骤:步骤S1、借助钢轨支撑门架将钢轨架设在设计路径上;步骤S2、施工人员转动转盘组件使夹轨钳夹紧钢轨;步骤S3、倾倒混凝土至可移动出料小车内;步骤S4、振捣混凝土,具有施工方便高效、操作难度低、可移动出料小车启停稳定等优点。
Concrete transporting and pouring equipment and method for rail transit inspection pit construction
The invention discloses concrete transporting and pouring equipment for rail transit inspection pit construction, which is characterized by comprising a movable discharging trolley and a start-stop overturn-preventing mechanism, the start-stop overturn-preventing mechanism comprises a locking assembly, a pulley assembly and a rail clamp, and the pulley assembly comprises a sector plate and an overturn-preventing pulley; the rail clamp is installed between the two sector plates in a hinged mode, the locking assembly comprises a main body frame, a pressing rod and a rotating disc assembly, and splayed pressing claws are arranged at the two ends of the pressing rod; the invention further discloses a concrete transporting and pouring method for construction of the rail transit inspection pit. The concrete transporting and pouring method comprises the following steps that S1, the steel rails are erected on a design path by means of the steel rail supporting door frame; s2, a constructor rotates a rotary disc assembly to enable a rail clamp to clamp the steel rail; s3, concrete is poured into the movable discharging trolley; the construction method has the advantages that construction is convenient and efficient, the operation difficulty is low, and the movable discharging trolley is stable in starting and stopping.
本发明公开了一种轨道交通检查坑施工的混凝土运输浇筑设备,其特征在于:包括可移动出料小车和启停防倾覆机构,启停防倾覆机构包括锁紧组件、滑轮组件和夹轨钳,滑轮组件包括扇形板和防倾覆滑轮,夹轨钳铰接安装在两个扇形板之间,锁紧组件包括主体框架、压紧杆和转盘组件,压紧杆两端设有“八”字型压爪;本发明还公开了一种轨道交通检查坑施工的混凝土运输浇筑方法,包括以下步骤:步骤S1、借助钢轨支撑门架将钢轨架设在设计路径上;步骤S2、施工人员转动转盘组件使夹轨钳夹紧钢轨;步骤S3、倾倒混凝土至可移动出料小车内;步骤S4、振捣混凝土,具有施工方便高效、操作难度低、可移动出料小车启停稳定等优点。
Concrete transporting and pouring equipment and method for rail transit inspection pit construction
一种轨道交通检查坑施工的混凝土运输浇筑设备及方法
LIU CHUNTAO (Autor:in) / XIAO FANGQI (Autor:in) / LIU FUPING (Autor:in) / WEI JUNCHEN (Autor:in) / WANG MENG (Autor:in) / YIN YUWAN (Autor:in)
04.08.2023
Patent
Elektronische Ressource
Chinesisch
Concrete pouring and transporting equipment for construction site
Europäisches Patentamt | 2023
|Concrete pouring formwork structure of rail transit maintenance pit
Europäisches Patentamt | 2023
|Movable multidirectional concrete pouring equipment and method for high-speed rail construction
Europäisches Patentamt | 2024
|