Construction method for supporting and fixing steel column anchor bolts
The invention relates to building construction, in particular to a construction method for supporting and fixing a steel column anchor bolt. Comprising the following steps that S1, an axis is arranged according to the position of a steel column, and foundation anchor bolts at the four corners of the steel column are positioned and fastened according to position coordinates of the foundation anchor bolts; s2, according to the four fixed anchor bolts, two first fixing plates provided with anchor bolt holes are symmetrically installed on the four anchor bolts and are subjected to spot welding, and two second fixing plates are welded between the ends of the two first fixing plates; s3, the anchor bolts are sequentially installed on the first fixing plate and the second fixing plate according to the drawing interval, and coordinates are measured again; s4, a fixing frame is welded to the inner side face or the outer side face of the fixing plate; and S5, the fixing frame is welded to bottom ribs of the raft. The method is convenient to operate and low in cost, the construction progress of anchor bolt embedding is accelerated, the construction quality is improved, and the stability and accuracy of anchor bolt installation are guaranteed.
本发明涉及建筑施工,特别是一种钢柱地脚锚栓支撑固定的施工方法。包括如下步骤:S1、按照钢柱位置布设轴线,根据地脚锚栓的位置坐标将钢柱四个角的地脚锚栓定位并紧固;S2、根据已固定好的四根地脚锚栓,将两条开设锚栓孔的第一固定板对称安装在四根地脚锚栓上并点焊,两条第一固定板的端部之间焊接两条第二固定板;S3、将地脚锚栓按照图纸间距依次安装在第一固定板和第二固定板上,复测坐标;S4、在固定板的内侧面或外侧面焊接固定架;S5、将固定架与筏板的底筋焊接。本发明操作方便,成本低,提高脚锚栓预埋的施工进度,提高施工质量,保证地脚锚栓安装的稳定性和精确度。
Construction method for supporting and fixing steel column anchor bolts
The invention relates to building construction, in particular to a construction method for supporting and fixing a steel column anchor bolt. Comprising the following steps that S1, an axis is arranged according to the position of a steel column, and foundation anchor bolts at the four corners of the steel column are positioned and fastened according to position coordinates of the foundation anchor bolts; s2, according to the four fixed anchor bolts, two first fixing plates provided with anchor bolt holes are symmetrically installed on the four anchor bolts and are subjected to spot welding, and two second fixing plates are welded between the ends of the two first fixing plates; s3, the anchor bolts are sequentially installed on the first fixing plate and the second fixing plate according to the drawing interval, and coordinates are measured again; s4, a fixing frame is welded to the inner side face or the outer side face of the fixing plate; and S5, the fixing frame is welded to bottom ribs of the raft. The method is convenient to operate and low in cost, the construction progress of anchor bolt embedding is accelerated, the construction quality is improved, and the stability and accuracy of anchor bolt installation are guaranteed.
本发明涉及建筑施工,特别是一种钢柱地脚锚栓支撑固定的施工方法。包括如下步骤:S1、按照钢柱位置布设轴线,根据地脚锚栓的位置坐标将钢柱四个角的地脚锚栓定位并紧固;S2、根据已固定好的四根地脚锚栓,将两条开设锚栓孔的第一固定板对称安装在四根地脚锚栓上并点焊,两条第一固定板的端部之间焊接两条第二固定板;S3、将地脚锚栓按照图纸间距依次安装在第一固定板和第二固定板上,复测坐标;S4、在固定板的内侧面或外侧面焊接固定架;S5、将固定架与筏板的底筋焊接。本发明操作方便,成本低,提高脚锚栓预埋的施工进度,提高施工质量,保证地脚锚栓安装的稳定性和精确度。
Construction method for supporting and fixing steel column anchor bolts
钢柱地脚锚栓支撑固定的施工方法
ZHANG WENPING (Autor:in) / CI GUOQIANG (Autor:in) / WANG JUNYONG (Autor:in)
04.08.2023
Patent
Elektronische Ressource
Chinesisch
Building Exterior Fixing Unit with Selectable Lower Anchor Bolts
Europäisches Patentamt | 2022
|