Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Overhaul operation tool and overhaul method for ultrahigh elevator shaft sightseeing glass curtain wall
The invention discloses an ultrahigh elevator shaft sightseeing glass curtain wall overhaul operation tool and an overhaul method.The ultrahigh elevator shaft sightseeing glass curtain wall overhaul operation tool comprises a winding device arranged at the top of a building, the output end of the winding device is connected with a hanging point of a hanging basket through a rope, and the hanging basket is of an L-shaped structure; lifting points at the two ends of the hanging basket are connected with the output ends of the corresponding winding devices through ropes respectively, two pulley supports are further arranged on the top of the building, fixed pulleys are hinged to the pulley supports, each fixed pulley is matched with the corresponding rope, and the ropes between the fixed pulleys and the lifting points of the hanging basket are in an inclined state; according to the overhauling tool, double driving devices and synchronous control are adopted, the overhauling personnel can complete operation of the two vertical glass curtain walls in the hanging basket with the L-shaped section at the same time, and the overhauling tool does not need to be installed and arranged again.
本发明公开一种超高电梯井观光玻璃幕墙检修作业工装及检修方法,包括一种超高电梯井观光玻璃幕墙检修作业工装,包括设于建筑顶部的卷扬装置,卷扬装置输出端通过绳索与吊篮吊点连接,所述吊篮为L型结构,其两端吊点分别通过绳索与相对应的卷扬装置输出端连接,所述建筑顶部还设有两个滑轮支架,滑轮支架上铰接设有定滑轮,每个定滑轮均与相对应的绳索配合,所述定滑轮与吊篮吊点之间的绳索为倾斜状态;本发明中的检修工装采用双驱动装置及同步控制,检修人员在L形截面吊篮内同时完成两个垂直玻璃幕墙的作业,不需要重新安装布置检修工装。
Overhaul operation tool and overhaul method for ultrahigh elevator shaft sightseeing glass curtain wall
The invention discloses an ultrahigh elevator shaft sightseeing glass curtain wall overhaul operation tool and an overhaul method.The ultrahigh elevator shaft sightseeing glass curtain wall overhaul operation tool comprises a winding device arranged at the top of a building, the output end of the winding device is connected with a hanging point of a hanging basket through a rope, and the hanging basket is of an L-shaped structure; lifting points at the two ends of the hanging basket are connected with the output ends of the corresponding winding devices through ropes respectively, two pulley supports are further arranged on the top of the building, fixed pulleys are hinged to the pulley supports, each fixed pulley is matched with the corresponding rope, and the ropes between the fixed pulleys and the lifting points of the hanging basket are in an inclined state; according to the overhauling tool, double driving devices and synchronous control are adopted, the overhauling personnel can complete operation of the two vertical glass curtain walls in the hanging basket with the L-shaped section at the same time, and the overhauling tool does not need to be installed and arranged again.
本发明公开一种超高电梯井观光玻璃幕墙检修作业工装及检修方法,包括一种超高电梯井观光玻璃幕墙检修作业工装,包括设于建筑顶部的卷扬装置,卷扬装置输出端通过绳索与吊篮吊点连接,所述吊篮为L型结构,其两端吊点分别通过绳索与相对应的卷扬装置输出端连接,所述建筑顶部还设有两个滑轮支架,滑轮支架上铰接设有定滑轮,每个定滑轮均与相对应的绳索配合,所述定滑轮与吊篮吊点之间的绳索为倾斜状态;本发明中的检修工装采用双驱动装置及同步控制,检修人员在L形截面吊篮内同时完成两个垂直玻璃幕墙的作业,不需要重新安装布置检修工装。
Overhaul operation tool and overhaul method for ultrahigh elevator shaft sightseeing glass curtain wall
一种超高电梯井观光玻璃幕墙检修作业工装及检修方法
HAO RUNLIANG (Autor:in) / ZHONG HENG (Autor:in) / CHEN ZHENGHU (Autor:in) / DENG XUFANG (Autor:in) / HUANG YAN (Autor:in)
08.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Elevator installation, overhaul and debugging simulation device
Europäisches Patentamt | 2021
|Online Contents | 1998
Online Contents | 1995
|