Construction method of damp-proof hollow ardealite block partition wall
A construction method of a damp-proof hollow ardealite block partition wall comprises the following steps that firstly, the wall face, the top face and the ground of a structure are cleaned and leveled, surveying and setting out are conducted, the position of a constructional column is determined, and a guide wall is arranged; secondly, small standard brick reverse ridges (3) are arranged above the cast-in-place floor slab (1) and between the structural columns or walls (2); thirdly, gypsum blocks (4) are arranged above the small standard brick reverse ridges (3), two pulling pieces (6) are arranged in each horizontal mortar joint in the height direction of the masonry of the gypsum blocks (4) and the structural column or wall (2), and one sides of the pulling pieces (6) are nailed into the structural column or wall (2) through expansion bolts (7); fourthly, after the space between the gypsum blocks (4) and the main body structural beam or the horizontal straining beam (10) is sealed through autoclaved aerated concrete blocks, concrete pouring is conducted on the structural beam or the horizontal straining beam (10). The method can save building materials, improve the construction quality and reduce the construction difficulty.
一种防潮型空心磷石膏砌块隔墙的施工方法,包括以下步骤:步骤一,将结构墙面、顶面、地面清理和找平,测量放线、确定构造柱位置,设置导墙;步骤二,现浇楼板(1)上方、结构柱或墙(2)之间设置小标砖砌反坎(3);步骤三,在小标砖砌反坎(3)上方配置石膏砌块(4),石膏砌块(4)砌体与结构柱或墙(2)高度方向每皮水平灰缝中设两条拉结片(6),拉结片(6)一侧用膨胀螺栓(7)钉入结构柱或墙(2)内;步骤四,石膏砌块(4)与主体结构梁或水平系梁(10)之间用蒸压加气混凝土砌块封闭后,再进行结构梁或水平系梁(10)混凝土浇筑。该方法能够节省建筑材料,提高施工质量,降低施工难度。
Construction method of damp-proof hollow ardealite block partition wall
A construction method of a damp-proof hollow ardealite block partition wall comprises the following steps that firstly, the wall face, the top face and the ground of a structure are cleaned and leveled, surveying and setting out are conducted, the position of a constructional column is determined, and a guide wall is arranged; secondly, small standard brick reverse ridges (3) are arranged above the cast-in-place floor slab (1) and between the structural columns or walls (2); thirdly, gypsum blocks (4) are arranged above the small standard brick reverse ridges (3), two pulling pieces (6) are arranged in each horizontal mortar joint in the height direction of the masonry of the gypsum blocks (4) and the structural column or wall (2), and one sides of the pulling pieces (6) are nailed into the structural column or wall (2) through expansion bolts (7); fourthly, after the space between the gypsum blocks (4) and the main body structural beam or the horizontal straining beam (10) is sealed through autoclaved aerated concrete blocks, concrete pouring is conducted on the structural beam or the horizontal straining beam (10). The method can save building materials, improve the construction quality and reduce the construction difficulty.
一种防潮型空心磷石膏砌块隔墙的施工方法,包括以下步骤:步骤一,将结构墙面、顶面、地面清理和找平,测量放线、确定构造柱位置,设置导墙;步骤二,现浇楼板(1)上方、结构柱或墙(2)之间设置小标砖砌反坎(3);步骤三,在小标砖砌反坎(3)上方配置石膏砌块(4),石膏砌块(4)砌体与结构柱或墙(2)高度方向每皮水平灰缝中设两条拉结片(6),拉结片(6)一侧用膨胀螺栓(7)钉入结构柱或墙(2)内;步骤四,石膏砌块(4)与主体结构梁或水平系梁(10)之间用蒸压加气混凝土砌块封闭后,再进行结构梁或水平系梁(10)混凝土浇筑。该方法能够节省建筑材料,提高施工质量,降低施工难度。
Construction method of damp-proof hollow ardealite block partition wall
一种防潮型空心磷石膏砌块隔墙的施工方法
11.08.2023
Patent
Elektronische Ressource
Chinesisch
Ardealite modified and strengthened damp-proof gypsum block
Europäisches Patentamt | 2015
|Ardealite-based fire-resistant partition construction process
Europäisches Patentamt | 2020
|High-strength separating wall ardealite building block
Europäisches Patentamt | 2015
|