Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cast-in-place pile construction concrete pumping hose winding and unwinding device
The invention provides a cast-in-place pile construction concrete pumping hose take-up and pay-off device, and relates to the technical field of building tools, the cast-in-place pile construction concrete pumping hose take-up and pay-off device comprises a support and a rotating shaft, the rotating shaft is rotatably arranged on the inner side of the support, the support is connected with a supporting shaft, a rotating body is rotatably arranged on the outer side of the supporting shaft, and the rotating body is driven by a starting part to rotate; a spiral shaft is arranged on the outer side of the rotating body; a supporting frame is connected to one side of the rotating shaft, and a moving block is movably mounted on one side of the supporting frame; pumping hoses are coiled through the rotating body, the pumping hoses on the rotating body can be released, more pumping hoses can be conveniently stored, the situation that the hoses are scratched by a pile head and the hoses are overlapped on the ground is avoided, the storage length can be automatically adjusted along with movement of the pile casing and rotation of the rotating body, combined storage and release are achieved, and the adaptability to different environments is high; the hose is prevented from being damaged, the service life of the hose is prolonged, a large amount of manpower is prevented from dragging the hose, cost is saved, and safety is guaranteed.
本发明提供了一种灌注桩施工混凝土泵送软管收放装置,涉及建筑工具技术领域,包括支架和转轴,所述转轴转动设在支架的内侧,所述支架上连接有支撑轴,且支撑轴的外侧转动设有旋转体,所述旋转体通过启动部驱动旋转,所述旋转体的外侧设有螺旋轴;所述转轴的一侧连接有支撑架,且支撑架的一侧活动安装有移动块;本发明通过旋转体来盘放泵送软管,可以释放旋转体上的泵送软管,也方便收纳更多泵送软管,避免造成桩机头划破软管和软管拖地叠加,收纳长度可以随着护筒移动和旋转体旋转做到自动调节,组合收放,不同环境适应能力强,避免软管损坏,延长软管的使用寿命,避免大量人工投入拖拽软管,节约成本,保障安全。
Cast-in-place pile construction concrete pumping hose winding and unwinding device
The invention provides a cast-in-place pile construction concrete pumping hose take-up and pay-off device, and relates to the technical field of building tools, the cast-in-place pile construction concrete pumping hose take-up and pay-off device comprises a support and a rotating shaft, the rotating shaft is rotatably arranged on the inner side of the support, the support is connected with a supporting shaft, a rotating body is rotatably arranged on the outer side of the supporting shaft, and the rotating body is driven by a starting part to rotate; a spiral shaft is arranged on the outer side of the rotating body; a supporting frame is connected to one side of the rotating shaft, and a moving block is movably mounted on one side of the supporting frame; pumping hoses are coiled through the rotating body, the pumping hoses on the rotating body can be released, more pumping hoses can be conveniently stored, the situation that the hoses are scratched by a pile head and the hoses are overlapped on the ground is avoided, the storage length can be automatically adjusted along with movement of the pile casing and rotation of the rotating body, combined storage and release are achieved, and the adaptability to different environments is high; the hose is prevented from being damaged, the service life of the hose is prolonged, a large amount of manpower is prevented from dragging the hose, cost is saved, and safety is guaranteed.
本发明提供了一种灌注桩施工混凝土泵送软管收放装置,涉及建筑工具技术领域,包括支架和转轴,所述转轴转动设在支架的内侧,所述支架上连接有支撑轴,且支撑轴的外侧转动设有旋转体,所述旋转体通过启动部驱动旋转,所述旋转体的外侧设有螺旋轴;所述转轴的一侧连接有支撑架,且支撑架的一侧活动安装有移动块;本发明通过旋转体来盘放泵送软管,可以释放旋转体上的泵送软管,也方便收纳更多泵送软管,避免造成桩机头划破软管和软管拖地叠加,收纳长度可以随着护筒移动和旋转体旋转做到自动调节,组合收放,不同环境适应能力强,避免软管损坏,延长软管的使用寿命,避免大量人工投入拖拽软管,节约成本,保障安全。
Cast-in-place pile construction concrete pumping hose winding and unwinding device
一种灌注桩施工混凝土泵送软管收放装置
LIU TIANBAO (Autor:in)
15.08.2023
Patent
Elektronische Ressource
Chinesisch
Hose winding and unwinding device and foundation construction equipment
Europäisches Patentamt | 2020
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
Europäisches Patentamt | 2019
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
Europäisches Patentamt | 2019
|CAST-IN-PLACE CONCRETE PILE CONSTRUCTION METHOD AND CAST-IN-PLACE CONCRETE PILE
Europäisches Patentamt | 2019
|CONSTRUCTION METHOD OF CAST-IN-PLACE CONCRETE PILE AND CAST-IN-PLACE CONCRETE PILE
Europäisches Patentamt | 2022
|