Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lifting type aerial work machine room suitable for steel structure construction
The invention discloses a lifting type aerial work machine room suitable for steel structure construction. The lifting type aerial work machine room comprises a box body, a first lifting device and a second lifting device. The first lifting device is arranged at the top of the box body and vertically moves relative to the box body, and first telescopic rods are oppositely arranged at the top of the first lifting device; the second lifting device comprises two sets of lifting assemblies, the two sets of lifting assemblies are oppositely arranged on the two sides of the box body and can move in the parallel direction relative to the side wall of the box body, and second telescopic rods are oppositely arranged on the two sets of lifting assemblies correspondingly. According to the scheme, the lifting devices are arranged on the top and the side walls correspondingly, self-climbing of the machine room in a whole-process lifting mode is achieved through the substitute devices on the top and the side walls, the problem that thin rods are stably pressed in the traditional climbing process is solved, and the safety performance of the machine room is greatly improved.
本发明公开了一种适用于钢结构施工的提升式高空作业机房,包括箱体,第一提升装置以及第二提升装置;所述第一提升装置设置于箱体顶部并相对于箱体进行竖向的移动,所述第一提升装置的顶部相对设有第一伸缩杆;所述第二提升装置包括两组提升组件,所述两组提升组件相对设置于箱体两侧,并可相对箱体的侧壁进行平行方向的移动,所述两组提升组件上分别相对设有第二伸缩杆。本方案通过在顶部和侧壁分别设置提升装置,通过顶部和侧壁的替身装置实现了本机房全过程提升方式的自爬升,解决了传统爬升过程中的细杆受压稳定问题,机房安全性能大幅提升。
Lifting type aerial work machine room suitable for steel structure construction
The invention discloses a lifting type aerial work machine room suitable for steel structure construction. The lifting type aerial work machine room comprises a box body, a first lifting device and a second lifting device. The first lifting device is arranged at the top of the box body and vertically moves relative to the box body, and first telescopic rods are oppositely arranged at the top of the first lifting device; the second lifting device comprises two sets of lifting assemblies, the two sets of lifting assemblies are oppositely arranged on the two sides of the box body and can move in the parallel direction relative to the side wall of the box body, and second telescopic rods are oppositely arranged on the two sets of lifting assemblies correspondingly. According to the scheme, the lifting devices are arranged on the top and the side walls correspondingly, self-climbing of the machine room in a whole-process lifting mode is achieved through the substitute devices on the top and the side walls, the problem that thin rods are stably pressed in the traditional climbing process is solved, and the safety performance of the machine room is greatly improved.
本发明公开了一种适用于钢结构施工的提升式高空作业机房,包括箱体,第一提升装置以及第二提升装置;所述第一提升装置设置于箱体顶部并相对于箱体进行竖向的移动,所述第一提升装置的顶部相对设有第一伸缩杆;所述第二提升装置包括两组提升组件,所述两组提升组件相对设置于箱体两侧,并可相对箱体的侧壁进行平行方向的移动,所述两组提升组件上分别相对设有第二伸缩杆。本方案通过在顶部和侧壁分别设置提升装置,通过顶部和侧壁的替身装置实现了本机房全过程提升方式的自爬升,解决了传统爬升过程中的细杆受压稳定问题,机房安全性能大幅提升。
Lifting type aerial work machine room suitable for steel structure construction
一种适用于钢结构施工的提升式高空作业机房
WANG KANG (Autor:in) / YIN GUANGHUA (Autor:in) / FAN JINGLEI (Autor:in) / YIN LANG (Autor:in)
15.08.2023
Patent
Elektronische Ressource
Chinesisch
Aerial work platform suitable for steel bridge construction
Europäisches Patentamt | 2020
|Aerial work platform for steel structure building construction
Europäisches Patentamt | 2023
|Aerial work platform for steel structure engineering construction
Europäisches Patentamt | 2022
|Limiting adjusting device suitable for rotary lifting of steel structure and construction method
Europäisches Patentamt | 2023
|