Pre-insertion method steel pipe column perpendicularity control device and construction method thereof
The invention relates to the technical field of building construction, in particular to a first-insertion-method steel pipe column perpendicularity control device and a construction method thereof.The first-insertion-method steel pipe column perpendicularity control device comprises the ground and a steel pipe column body, a fixing assembly used for limiting the steel pipe column body is arranged at the top of the ground, and two moving rails are symmetrically arranged at the top of the ground; a portal frame is slidably mounted on the moving rail, a knocking assembly used for knocking the steel pipe column is arranged at the top end of the portal frame, and a walking assembly used for driving the portal frame to walk is arranged on the outer wall of the bottom end of the portal frame. And the construction time is not influenced.
本发明涉及建筑施工技术领域,具体是一种先插法钢管柱垂直度控制装置及其施工方法,包括地面和钢管柱体,所述地面的顶部设有用于对钢管柱体进行限位的固定组件,所述地面的顶部对称设置有两个移动轨,所述移动轨上滑动安装有龙门架,所述龙门架的顶端设有用于对钢管柱体进行敲击的敲击组件,所述龙门架的底端外壁上设有驱动龙门架进行行走的行走组件,本发明实现快速将固定组件与钢管柱体进行组装,自动化程度高,不会影响施工的时间。
Pre-insertion method steel pipe column perpendicularity control device and construction method thereof
The invention relates to the technical field of building construction, in particular to a first-insertion-method steel pipe column perpendicularity control device and a construction method thereof.The first-insertion-method steel pipe column perpendicularity control device comprises the ground and a steel pipe column body, a fixing assembly used for limiting the steel pipe column body is arranged at the top of the ground, and two moving rails are symmetrically arranged at the top of the ground; a portal frame is slidably mounted on the moving rail, a knocking assembly used for knocking the steel pipe column is arranged at the top end of the portal frame, and a walking assembly used for driving the portal frame to walk is arranged on the outer wall of the bottom end of the portal frame. And the construction time is not influenced.
本发明涉及建筑施工技术领域,具体是一种先插法钢管柱垂直度控制装置及其施工方法,包括地面和钢管柱体,所述地面的顶部设有用于对钢管柱体进行限位的固定组件,所述地面的顶部对称设置有两个移动轨,所述移动轨上滑动安装有龙门架,所述龙门架的顶端设有用于对钢管柱体进行敲击的敲击组件,所述龙门架的底端外壁上设有驱动龙门架进行行走的行走组件,本发明实现快速将固定组件与钢管柱体进行组装,自动化程度高,不会影响施工的时间。
Pre-insertion method steel pipe column perpendicularity control device and construction method thereof
一种先插法钢管柱垂直度控制装置及其施工方法
HU HAITAO (Autor:in) / WANG JIANPING (Autor:in) / WU XINGRONG (Autor:in) / LI JIALU (Autor:in) / WEI HONGLIANG (Autor:in) / LUO CHONGDE (Autor:in) / ZHOU LEI (Autor:in) / CAI DONGWEI (Autor:in) / LIU FUJIANG (Autor:in) / QIN PING (Autor:in)
18.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Perpendicularity control method for post-insertion steel pipe column
Europäisches Patentamt | 2022
|Steel pipe pile perpendicularity accurate control device and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Steel pipe perpendicularity control device for one column and one pile and using method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|