Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Post-anchoring integral type connecting piece and installation and construction method thereof
A post-anchored integral curtain wall connecting piece is jointly composed of a first component, a second component and a third component, two or more long holes are formed in the first component and can be arranged side by side up and down, and a notch is formed in the upper edge of the first component; two or more holes are formed in the middle of the third component; all the components are fixedly connected into a whole through integral casting or other reliable modes, standardized fixed connection operation is carried out in a factory or a factory building, the outdoor high-altitude welding operation amount in traditional curtain wall engineering is greatly reduced, fire protection hidden dangers are reduced, and the installation efficiency is improved; the damage of high-temperature welding to the structural strength of the chemical anchor bolt is reduced, and the engineering quality is safer and more reliable; through treatment of the connecting piece, a worker can stand on a building main body floor to carry out curtain wall keel positioning, punching and anchoring operation, outdoor high-altitude operation is reduced, the danger coefficient and the construction difficulty are reduced, and the construction period can be effectively shortened.
一种后锚固整体式幕墙连接件,连接件由构件一、构件二和构件三共同组成,构件一上开设有两个或两个以上长孔,孔可上下并排设置,在构件一的上边沿开设有缺口;构件三中部开设两个或两个以上孔;本发明通过整体铸造或其他可靠方式将各个部件相互固定连接成为一体,在工厂或厂房内进行标准化固定连接作业,大大减少传统幕墙工程中室外高空焊接作业量,降低消防隐患,提高安装效率;减少了高温焊接对化学锚栓结构强度的破坏,工程质量更加安全可靠;通过该连接件的处理,工人站立于建筑主体楼板上即可进行幕墙龙骨定位、打孔及锚固作业,减少室外高空作业,降低危险系数和施工难度,可有效缩短工期。
Post-anchoring integral type connecting piece and installation and construction method thereof
A post-anchored integral curtain wall connecting piece is jointly composed of a first component, a second component and a third component, two or more long holes are formed in the first component and can be arranged side by side up and down, and a notch is formed in the upper edge of the first component; two or more holes are formed in the middle of the third component; all the components are fixedly connected into a whole through integral casting or other reliable modes, standardized fixed connection operation is carried out in a factory or a factory building, the outdoor high-altitude welding operation amount in traditional curtain wall engineering is greatly reduced, fire protection hidden dangers are reduced, and the installation efficiency is improved; the damage of high-temperature welding to the structural strength of the chemical anchor bolt is reduced, and the engineering quality is safer and more reliable; through treatment of the connecting piece, a worker can stand on a building main body floor to carry out curtain wall keel positioning, punching and anchoring operation, outdoor high-altitude operation is reduced, the danger coefficient and the construction difficulty are reduced, and the construction period can be effectively shortened.
一种后锚固整体式幕墙连接件,连接件由构件一、构件二和构件三共同组成,构件一上开设有两个或两个以上长孔,孔可上下并排设置,在构件一的上边沿开设有缺口;构件三中部开设两个或两个以上孔;本发明通过整体铸造或其他可靠方式将各个部件相互固定连接成为一体,在工厂或厂房内进行标准化固定连接作业,大大减少传统幕墙工程中室外高空焊接作业量,降低消防隐患,提高安装效率;减少了高温焊接对化学锚栓结构强度的破坏,工程质量更加安全可靠;通过该连接件的处理,工人站立于建筑主体楼板上即可进行幕墙龙骨定位、打孔及锚固作业,减少室外高空作业,降低危险系数和施工难度,可有效缩短工期。
Post-anchoring integral type connecting piece and installation and construction method thereof
一种后锚固整体式连接件及其安装施工方法
LIAN YIMIN (Autor:in) / GUO WEI (Autor:in) / GUO QINGWEI (Autor:in) / YAN LING (Autor:in) / ZHU XIAOLU (Autor:in) / HU ZHIBO (Autor:in) / FAN HUIMIN (Autor:in) / ZHANG YANJUN (Autor:in)
18.08.2023
Patent
Elektronische Ressource
Chinesisch
Anchoring type split connecting piece and mounting method thereof
Europäisches Patentamt | 2021
|Assembly type wallboard installation connecting piece
Europäisches Patentamt | 2023
|Connecting piece, ALC installation joint structure and construction method
Europäisches Patentamt | 2023
|