Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete-filled steel tube fabricated building house and assembly method thereof
The invention discloses a concrete-filled steel tube fabricated building house which comprises an elastic supporting piece and a fixed bottom plate, the elastic supporting piece is fixedly mounted at the bottom of the fixed bottom plate, a plurality of first plate pieces are mounted on the outer surface of the upper end of the fixed bottom plate in a spliced mode, and a fixed top frame is arranged at the upper ends of the first plate pieces; the outer surface of the top of the fixed top frame is provided with a plurality of groups of second plates in a splicing manner, concrete is poured into the first plates and the second plates, a plurality of groups of butt-joint steel pipes are inserted into the inner sides of the first plates and the second plates and are arranged side by side, and the lower part of the fixed bottom plate is fixedly provided with a storage box. According to the assembly type building house, the steel pipes can be matched with the concrete to improve the integrity of the structural strength of the assembly type building house, the assembly type building house has good sealing performance, waterproofness and heat preservation performance, by additionally arranging the butt joint steel pipes and filling the concrete, the first plates or the second plates can be seamlessly spliced, and the sealing effect of the outer wall structure is improved.
本发明公开一种钢管混凝土装配式建筑房屋,包括弹性撑件和固定底板,所述弹性撑件固定安装在固定底板的底部,所述固定底板的上端外表面拼接安装有若干组第一板件,所述第一板件的上端设置有固定顶框,且固定顶框的顶部外表面拼接安装有若干组第二板件,第一板件和第二板件的内部均浇筑有混凝土,且第一板件和第二板件的内侧均插入有若干组对接钢管,若干组对接钢管之间并排设置,所述固定底板的下部固定安装有储存箱;可以通过钢管配合混凝土提升装配式建筑房屋的结构强度的一体性,令其具有良好的密封性、防水性和保温性,通过加装对接钢管和灌装混凝土,可使得多块第一板件或第二板件均无缝拼接,提升外墙结构的密封效果。
Concrete-filled steel tube fabricated building house and assembly method thereof
The invention discloses a concrete-filled steel tube fabricated building house which comprises an elastic supporting piece and a fixed bottom plate, the elastic supporting piece is fixedly mounted at the bottom of the fixed bottom plate, a plurality of first plate pieces are mounted on the outer surface of the upper end of the fixed bottom plate in a spliced mode, and a fixed top frame is arranged at the upper ends of the first plate pieces; the outer surface of the top of the fixed top frame is provided with a plurality of groups of second plates in a splicing manner, concrete is poured into the first plates and the second plates, a plurality of groups of butt-joint steel pipes are inserted into the inner sides of the first plates and the second plates and are arranged side by side, and the lower part of the fixed bottom plate is fixedly provided with a storage box. According to the assembly type building house, the steel pipes can be matched with the concrete to improve the integrity of the structural strength of the assembly type building house, the assembly type building house has good sealing performance, waterproofness and heat preservation performance, by additionally arranging the butt joint steel pipes and filling the concrete, the first plates or the second plates can be seamlessly spliced, and the sealing effect of the outer wall structure is improved.
本发明公开一种钢管混凝土装配式建筑房屋,包括弹性撑件和固定底板,所述弹性撑件固定安装在固定底板的底部,所述固定底板的上端外表面拼接安装有若干组第一板件,所述第一板件的上端设置有固定顶框,且固定顶框的顶部外表面拼接安装有若干组第二板件,第一板件和第二板件的内部均浇筑有混凝土,且第一板件和第二板件的内侧均插入有若干组对接钢管,若干组对接钢管之间并排设置,所述固定底板的下部固定安装有储存箱;可以通过钢管配合混凝土提升装配式建筑房屋的结构强度的一体性,令其具有良好的密封性、防水性和保温性,通过加装对接钢管和灌装混凝土,可使得多块第一板件或第二板件均无缝拼接,提升外墙结构的密封效果。
Concrete-filled steel tube fabricated building house and assembly method thereof
一种钢管混凝土装配式建筑房屋及其装配方法
CHEN CHUANMING (Autor:in) / XU HONG (Autor:in) / LIU YUTING (Autor:in) / TIAN YE (Autor:in) / SUN SIWEN (Autor:in) / ZHANG GUANGHONG (Autor:in) / LI SHITAO (Autor:in) / GAO XIANGDONG (Autor:in)
22.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
E04G
SCAFFOLDING
,
Baugerüste
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Structure of concrete-filled steel tube fabricated building and assembling method thereof
Europäisches Patentamt | 2021
|Preparation method of novel fabricated concrete-filled steel tube building structure
Europäisches Patentamt | 2024
|Fabricated concrete-filled steel tube building anti-seismic isolation support
Europäisches Patentamt | 2024
|Fabricated type concrete-filled steel tube supporting system and construction method thereof
Europäisches Patentamt | 2020
|Concrete-filled steel tube column body of building and building method thereof
Europäisches Patentamt | 2015
|