Large-diameter root key cast-in-place pile construction method adopting complex root key implanting device
The invention discloses a large-diameter root key cast-in-place pile construction method adopting a complex root key implanting device. The method comprises the construction steps of cast-in-place pile hole drilling, prefabricated root key production, root key jacking and implanting device assembling, prefabricated root key installation, reinforcement cage construction, root key jacking and implanting device lowering, counter-force system construction, root key jacking construction, concrete pouring and the like. The root key jacking and implanting device is composed of an outer cylinder body, an inner cylinder body, a root key storage cabin, a guide sliding groove, a double-thread jack and a root key cover. The root key pushing device is internally provided with a root key storage cabin and a double-thread jack, the pushing device only needs to be lowered into a cast-in-place pile hole once, and the problems that the construction period is long, the construction precision is low, and hole shrinkage and hole collapse are likely to occur when the pushing device is pulled out of the hole, the root key is placed and then the pushing device is lowered into a designated position for pushing in each construction of a traditional root key can be solved. The double-thread jack can realize staggered pushing of upper and lower layers; therefore, the staggered root key cast-in-place pile is formed.
本发明公开了一种采用复杂根键植入装置的大直径根键灌注桩施工方法,包括钻设灌注桩孔、生产预制根键、根键顶进植入装置组装、预制根键安装、钢筋笼施工、根键顶进植入装置下放、反力体系施工、根键顶进施工、混凝土灌注等施工步骤;根键顶进植入装置,由外筒体、内筒体、根键储存舱、引导滑槽、双线程千斤顶及根键罩组成;根键顶推装置内部设置根键储存舱和双线程千斤顶,顶推装置只需一次下放灌注桩孔,可解决传统根键每次施工将顶推装置拔出孔外放置根键再下放指定位置进行顶推存在的施工周期长、施工精度低、容易出现缩孔塌孔等问题;且双线程千斤顶可实现上下层错位顶推;从而形成错位根键灌注桩。
Large-diameter root key cast-in-place pile construction method adopting complex root key implanting device
The invention discloses a large-diameter root key cast-in-place pile construction method adopting a complex root key implanting device. The method comprises the construction steps of cast-in-place pile hole drilling, prefabricated root key production, root key jacking and implanting device assembling, prefabricated root key installation, reinforcement cage construction, root key jacking and implanting device lowering, counter-force system construction, root key jacking construction, concrete pouring and the like. The root key jacking and implanting device is composed of an outer cylinder body, an inner cylinder body, a root key storage cabin, a guide sliding groove, a double-thread jack and a root key cover. The root key pushing device is internally provided with a root key storage cabin and a double-thread jack, the pushing device only needs to be lowered into a cast-in-place pile hole once, and the problems that the construction period is long, the construction precision is low, and hole shrinkage and hole collapse are likely to occur when the pushing device is pulled out of the hole, the root key is placed and then the pushing device is lowered into a designated position for pushing in each construction of a traditional root key can be solved. The double-thread jack can realize staggered pushing of upper and lower layers; therefore, the staggered root key cast-in-place pile is formed.
本发明公开了一种采用复杂根键植入装置的大直径根键灌注桩施工方法,包括钻设灌注桩孔、生产预制根键、根键顶进植入装置组装、预制根键安装、钢筋笼施工、根键顶进植入装置下放、反力体系施工、根键顶进施工、混凝土灌注等施工步骤;根键顶进植入装置,由外筒体、内筒体、根键储存舱、引导滑槽、双线程千斤顶及根键罩组成;根键顶推装置内部设置根键储存舱和双线程千斤顶,顶推装置只需一次下放灌注桩孔,可解决传统根键每次施工将顶推装置拔出孔外放置根键再下放指定位置进行顶推存在的施工周期长、施工精度低、容易出现缩孔塌孔等问题;且双线程千斤顶可实现上下层错位顶推;从而形成错位根键灌注桩。
Large-diameter root key cast-in-place pile construction method adopting complex root key implanting device
采用复杂根键植入装置的大直径根键灌注桩施工方法
25.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Large-diameter super-long cast-in-place pile construction method
Europäisches Patentamt | 2021
|Portable large-diameter timber pile implanting equipment
Europäisches Patentamt | 2022
|Construction method of large-diameter super-long cast-in-place pile
Europäisches Patentamt | 2023
|Prefabricated tubular pile implanting equipment and pile implanting construction method
Europäisches Patentamt | 2020
|