Building-riding type structure construction method crossing common underground diaphragm wall
The invention discloses a building-riding type structure construction method crossing a common underground diaphragm wall. The construction method comprises the steps of subway station diaphragm wall enclosure structure construction, deep foundation pit second inner support dismantling, common diaphragm wall opening and negative first-layer beam inclined column steel bar penetrating, negative first-layer beam plate construction, subway station first concrete inner support dismantling, engineering first concrete inner support dismantling, common diaphragm wall above negative first-layer beam plate dismantling and basement top plate construction. And dismantling a common underground diaphragm wall between the first-layer plate and the second-layer plate, and constructing a temporary hole of a floor. By the adoption of the construction method, land resources are saved, the construction period is shortened, the construction efficiency is improved, and the cost of a constructor is saved.
一种跨越共用地连墙的“骑楼式”结构施工方法,所述施工方法包括地铁车站地连墙围护结构施工、拆深基坑第二道内支撑、共用地连墙开洞穿负一层梁斜柱钢筋、负一层梁板施工、拆除地铁车站第一道砼内支撑、拆除工程第一道砼内支撑、拆负一层梁板以上共用地连墙、地下室顶板施工、拆负一、二层板之间共用地连墙、楼板临时洞口施工。采用本发明的施工方法,节省了土地资源,缩短施工工期,提高施工效率,节省建设方的成本。
Building-riding type structure construction method crossing common underground diaphragm wall
The invention discloses a building-riding type structure construction method crossing a common underground diaphragm wall. The construction method comprises the steps of subway station diaphragm wall enclosure structure construction, deep foundation pit second inner support dismantling, common diaphragm wall opening and negative first-layer beam inclined column steel bar penetrating, negative first-layer beam plate construction, subway station first concrete inner support dismantling, engineering first concrete inner support dismantling, common diaphragm wall above negative first-layer beam plate dismantling and basement top plate construction. And dismantling a common underground diaphragm wall between the first-layer plate and the second-layer plate, and constructing a temporary hole of a floor. By the adoption of the construction method, land resources are saved, the construction period is shortened, the construction efficiency is improved, and the cost of a constructor is saved.
一种跨越共用地连墙的“骑楼式”结构施工方法,所述施工方法包括地铁车站地连墙围护结构施工、拆深基坑第二道内支撑、共用地连墙开洞穿负一层梁斜柱钢筋、负一层梁板施工、拆除地铁车站第一道砼内支撑、拆除工程第一道砼内支撑、拆负一层梁板以上共用地连墙、地下室顶板施工、拆负一、二层板之间共用地连墙、楼板临时洞口施工。采用本发明的施工方法,节省了土地资源,缩短施工工期,提高施工效率,节省建设方的成本。
Building-riding type structure construction method crossing common underground diaphragm wall
一种跨越共用地连墙的“骑楼式”结构施工方法
JIANG JUNZAN (Autor:in) / ZENG JIA (Autor:in) / XIE YONGCHAO (Autor:in) / LI HUIYING (Autor:in) / HUANG JIAN (Autor:in) / HUANG LUNYING (Autor:in)
25.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Construction method of underground diaphragm wall and underground diaphragm wall
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Underground diaphragm wall joint and construction method of underground diaphragm wall
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|