Greenhouse steel structure on coke oven top steel truss and equipment installation method
The invention discloses a method for installing a greenhouse steel structure and equipment on a coke oven top steel truss. The method is characterized by comprising the following steps: a, laying a gantry crane track beam; b, determining the shape of a gantry crane and integrally installing the gantry crane; and c, installing the steel structure and the equipment by adopting the gantry crane. The method for installing the greenhouse steel structure and the equipment on the coke oven top steel truss has the advantages that the gantry crane and the track are reasonable in design, type selection and layout, the structure is safe, installation and use are convenient, the steel structure and the equipment of any part are installed through an electric hoist of the gantry crane, flexibility and convenience are achieved, construction efficiency is high, coke oven production is not affected, and the cost is low. The problem that overhead steel structure equipment is difficult to mount under the condition that cranes cannot be positioned on the two sides of the coke oven is solved, and meanwhile, the method has the advantages of no influence on production and operation of the coke oven, high construction speed and low cost.
一种焦炉顶部钢桁架上大棚钢结构和设备安装方法,其特征在于包括以下步骤:a、铺设龙门吊轨道梁,b、龙门吊外形确定及整体安装,c、采用龙门吊安装钢结构和设备。本发明的焦炉顶部钢桁架上大棚钢结构和设备安装方法具有龙门吊及轨道设计选型、布局合理,结构安全、安装使用方便,利用龙门吊的电动葫芦进行任何部位的钢结构与设备安装,灵活方便,施工效率高,不影响焦炉生产,解决了在焦炉两侧无法站位吊车的条件下,进行高空钢结构设备安装难题,同时具有不影响焦炉生产运行、施工速度快和成本低的优点。
Greenhouse steel structure on coke oven top steel truss and equipment installation method
The invention discloses a method for installing a greenhouse steel structure and equipment on a coke oven top steel truss. The method is characterized by comprising the following steps: a, laying a gantry crane track beam; b, determining the shape of a gantry crane and integrally installing the gantry crane; and c, installing the steel structure and the equipment by adopting the gantry crane. The method for installing the greenhouse steel structure and the equipment on the coke oven top steel truss has the advantages that the gantry crane and the track are reasonable in design, type selection and layout, the structure is safe, installation and use are convenient, the steel structure and the equipment of any part are installed through an electric hoist of the gantry crane, flexibility and convenience are achieved, construction efficiency is high, coke oven production is not affected, and the cost is low. The problem that overhead steel structure equipment is difficult to mount under the condition that cranes cannot be positioned on the two sides of the coke oven is solved, and meanwhile, the method has the advantages of no influence on production and operation of the coke oven, high construction speed and low cost.
一种焦炉顶部钢桁架上大棚钢结构和设备安装方法,其特征在于包括以下步骤:a、铺设龙门吊轨道梁,b、龙门吊外形确定及整体安装,c、采用龙门吊安装钢结构和设备。本发明的焦炉顶部钢桁架上大棚钢结构和设备安装方法具有龙门吊及轨道设计选型、布局合理,结构安全、安装使用方便,利用龙门吊的电动葫芦进行任何部位的钢结构与设备安装,灵活方便,施工效率高,不影响焦炉生产,解决了在焦炉两侧无法站位吊车的条件下,进行高空钢结构设备安装难题,同时具有不影响焦炉生产运行、施工速度快和成本低的优点。
Greenhouse steel structure on coke oven top steel truss and equipment installation method
一种焦炉顶部钢桁架上大棚钢结构和设备安装方法
SU YUANHONG (Autor:in) / WANG XIAOXING (Autor:in) / HE BIN (Autor:in)
25.08.2023
Patent
Elektronische Ressource
Chinesisch
Coke oven machine side greenhouse installation method for coke oven transformation project
Europäisches Patentamt | 2023
|Coke oven greenhouse wall surface color steel plate structure and method
Europäisches Patentamt | 2023
|Modular installation method for pipeline truss of heat recovery coke oven
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Steel foundation for mounting tower crane on top of coke oven permanent shed roof steel truss
Europäisches Patentamt | 2023
|