Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Earthwork standard room and large-area backfill soil control method
The invention relates to the technical field of soil loss prevention, and particularly discloses an earthwork standard room and a large-area backfill prevention method, the earthwork standard room comprises a first grid plate and a second grid plate, the outer wall of the first grid plate is provided with a first through hole, the outer wall of the second grid plate is provided with a second through hole, the outer wall of the first grid plate is wavy, and the outer wall of the second grid plate is wavy. The outer wall of the second grating is in a wave shape. According to the invention, the geocell is convenient to transport, the geocell can be tensioned into a net shape during construction, after loose materials such as backfill soil are filled, the characteristics of strong lateral limitation and large-rigidity structural body can be formed, meanwhile, the positions of the first measuring plate and the second measuring plate are manually adjusted by a worker, and the clamping groove plate and the clamping plate are connected and fixed, so that the construction efficiency is greatly improved. According to the device, deformation of the soil cells is buffered, damage to the soil cells during deformation is reduced, meanwhile, a worker can measure the area of a foundation through a first sliding plate and a second sliding plate, and therefore the functionality of the device is improved.
本发明涉及防填土流失技术领域,具体公开了一种土工格室及大面积回填土防治方法,包括:第一格板和第二格板,所述第一格板的外壁开设有第一通孔,所述第二格板的外壁开设有第二通孔,所述第一格板的外壁呈波浪形,所述第二格板的外壁呈波浪形;本发明便于对格室进行运输,施工时可张拉成网状,在填入回填土等松散物料后,可构成具有强大侧向限制和大刚度结构体的特点,同时通过工作人员进行手动调节第一测量板和第二测量板的位置,通过将卡槽板和卡板进行连接固定,从而对土格室的形变进行缓冲,从而减少土格室发生形变时的受损,同时工作人员可以利用第一滑板和第二滑板对地基的面积大小进行测量,从而增加装置的功能性。
Earthwork standard room and large-area backfill soil control method
The invention relates to the technical field of soil loss prevention, and particularly discloses an earthwork standard room and a large-area backfill prevention method, the earthwork standard room comprises a first grid plate and a second grid plate, the outer wall of the first grid plate is provided with a first through hole, the outer wall of the second grid plate is provided with a second through hole, the outer wall of the first grid plate is wavy, and the outer wall of the second grid plate is wavy. The outer wall of the second grating is in a wave shape. According to the invention, the geocell is convenient to transport, the geocell can be tensioned into a net shape during construction, after loose materials such as backfill soil are filled, the characteristics of strong lateral limitation and large-rigidity structural body can be formed, meanwhile, the positions of the first measuring plate and the second measuring plate are manually adjusted by a worker, and the clamping groove plate and the clamping plate are connected and fixed, so that the construction efficiency is greatly improved. According to the device, deformation of the soil cells is buffered, damage to the soil cells during deformation is reduced, meanwhile, a worker can measure the area of a foundation through a first sliding plate and a second sliding plate, and therefore the functionality of the device is improved.
本发明涉及防填土流失技术领域,具体公开了一种土工格室及大面积回填土防治方法,包括:第一格板和第二格板,所述第一格板的外壁开设有第一通孔,所述第二格板的外壁开设有第二通孔,所述第一格板的外壁呈波浪形,所述第二格板的外壁呈波浪形;本发明便于对格室进行运输,施工时可张拉成网状,在填入回填土等松散物料后,可构成具有强大侧向限制和大刚度结构体的特点,同时通过工作人员进行手动调节第一测量板和第二测量板的位置,通过将卡槽板和卡板进行连接固定,从而对土格室的形变进行缓冲,从而减少土格室发生形变时的受损,同时工作人员可以利用第一滑板和第二滑板对地基的面积大小进行测量,从而增加装置的功能性。
Earthwork standard room and large-area backfill soil control method
一种土工格室及大面积回填土防治方法
LI HAIXIN (Autor:in) / ZHAO FEI (Autor:in) / ZHANG GUOFEI (Autor:in) / LIU JIARUI (Autor:in) / LUO JINGXIN (Autor:in) / ZANG RUI (Autor:in) / DONG JINYI (Autor:in) / XIAO YONGCHENG (Autor:in) / XU CHEN (Autor:in) / LI ZHIMEI (Autor:in)
01.09.2023
Patent
Elektronische Ressource
Chinesisch
Earthwork standard room connecting piece and earthwork standard room
Europäisches Patentamt | 2023
|Plate for earthwork standard room and stepped earthwork standard room
Europäisches Patentamt | 2023
|