Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete continuous pouring bottom plate and construction method thereof
The invention discloses a concrete continuous pouring bottom plate and a construction method thereof, and belongs to the field of concrete pouring. The construction method of the concrete continuous pouring bottom plate comprises the following steps that a pump truck moves to a designated position, a discharging mechanism works, the distance between every two adjacent discharging pipes is adjusted, the position of each sealing plate is adjusted, and the sealing plates at the designated positions are in a semi-open state. And the tank truck enters the yard and conveys the concrete into the pump truck. The pumping system works; and the cantilever crane system works, the position of the discharging pipe is moved, and inclined layered pushing type pouring is carried out. According to the actual concrete height, the position of the sealing plate is adjusted, and then the discharging flow of the discharging pipe is changed, so that the actual heights of concrete at all positions are roughly the same. According to the scheme, synchronous pouring can be conducted on different pouring sites at the same time, and the situation that due to the deviation of the pouring time, solidified concrete cracks is avoided.
本发明公开了一种混凝土连续浇筑底板及其施工方法,属于混凝土浇筑领域。一种混凝土连续浇筑底板的施工方法,包括以下步骤,泵车运动至指定位置,出料机构工作,调整相邻两个下料管之间的间距,调整各个密封板位置,使指定位置的密封板处于半开状态。罐车入场,并将混凝土输送至泵车内。泵送系统工作;臂架系统工作,移动下料管的位置,进行斜向分层推移式浇筑。根据实际混凝土高度,调整密封板的位置,进而改变下料管下料的流量,使得各个位置的混凝土的实际高度大致相同。本方案可以同一时间对不同的浇筑地点进行同步浇筑,避免由于浇筑时间的偏差而导致凝固后的混凝土开裂。
Concrete continuous pouring bottom plate and construction method thereof
The invention discloses a concrete continuous pouring bottom plate and a construction method thereof, and belongs to the field of concrete pouring. The construction method of the concrete continuous pouring bottom plate comprises the following steps that a pump truck moves to a designated position, a discharging mechanism works, the distance between every two adjacent discharging pipes is adjusted, the position of each sealing plate is adjusted, and the sealing plates at the designated positions are in a semi-open state. And the tank truck enters the yard and conveys the concrete into the pump truck. The pumping system works; and the cantilever crane system works, the position of the discharging pipe is moved, and inclined layered pushing type pouring is carried out. According to the actual concrete height, the position of the sealing plate is adjusted, and then the discharging flow of the discharging pipe is changed, so that the actual heights of concrete at all positions are roughly the same. According to the scheme, synchronous pouring can be conducted on different pouring sites at the same time, and the situation that due to the deviation of the pouring time, solidified concrete cracks is avoided.
本发明公开了一种混凝土连续浇筑底板及其施工方法,属于混凝土浇筑领域。一种混凝土连续浇筑底板的施工方法,包括以下步骤,泵车运动至指定位置,出料机构工作,调整相邻两个下料管之间的间距,调整各个密封板位置,使指定位置的密封板处于半开状态。罐车入场,并将混凝土输送至泵车内。泵送系统工作;臂架系统工作,移动下料管的位置,进行斜向分层推移式浇筑。根据实际混凝土高度,调整密封板的位置,进而改变下料管下料的流量,使得各个位置的混凝土的实际高度大致相同。本方案可以同一时间对不同的浇筑地点进行同步浇筑,避免由于浇筑时间的偏差而导致凝固后的混凝土开裂。
Concrete continuous pouring bottom plate and construction method thereof
一种混凝土连续浇筑底板及其施工方法
YAO JUNJIE (Autor:in) / TANG GUOWEI (Autor:in) / JIN JIN (Autor:in)
05.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Large-thickness continuous seamless pouring concrete bottom plate and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Deep foundation pit super-thick concrete bottom plate pouring system and construction method
Europäisches Patentamt | 2015
|