Large-thickness continuous seamless pouring concrete bottom plate and construction method thereof
The invention relates to a large-thickness continuous seamless pouring concrete bottom plate and a construction method thereof. According to the scheme, the construction method comprises the following steps that S100, a channel steel support supporting system is pre-tensioned; s200, the elevator car mold is installed; s300, a pump pipe support is erected; s400, arranging an intelligent temperature measurement system; s500, layered pouring is conducted on the whole inclined face; and S600, the circulating water maintenance system is installed till pouring of the large-thickness bottom plate is completed, a water source inlet is formed in the cooling water tank, the maintenance water pipe is located at the top end of the large-thickness bottom plate, and the pre-buried cooling water pipe is located on the lower middle portion of the large-thickness bottom plate. The construction method has the advantages that the construction quality and the construction efficiency of large-thickness bottom plate steel bar binding, foundation pit formwork erecting, concrete pouring and curing are improved.
本发明涉及大厚度连续无缝浇筑混凝土底板及其施工方法,该方案包括以下步骤:S100、槽钢支架支撑体系预拉;S200、电梯箱模安装;S300、泵管支撑架设;S400、智能测温系统布置;S500、整体斜面分层浇筑;S600、循环水养护系统安装,最后直至大厚度底板浇筑完成,其中冷却水箱上设有水源进口,养护水管位于大厚度底板的顶端位置,预埋冷却水管位于大厚度底板的中下部。本申请具有提高大厚度底板钢筋绑扎、基坑模板支设、混凝土浇筑、养护的施工质量和施工效率的优点。
Large-thickness continuous seamless pouring concrete bottom plate and construction method thereof
The invention relates to a large-thickness continuous seamless pouring concrete bottom plate and a construction method thereof. According to the scheme, the construction method comprises the following steps that S100, a channel steel support supporting system is pre-tensioned; s200, the elevator car mold is installed; s300, a pump pipe support is erected; s400, arranging an intelligent temperature measurement system; s500, layered pouring is conducted on the whole inclined face; and S600, the circulating water maintenance system is installed till pouring of the large-thickness bottom plate is completed, a water source inlet is formed in the cooling water tank, the maintenance water pipe is located at the top end of the large-thickness bottom plate, and the pre-buried cooling water pipe is located on the lower middle portion of the large-thickness bottom plate. The construction method has the advantages that the construction quality and the construction efficiency of large-thickness bottom plate steel bar binding, foundation pit formwork erecting, concrete pouring and curing are improved.
本发明涉及大厚度连续无缝浇筑混凝土底板及其施工方法,该方案包括以下步骤:S100、槽钢支架支撑体系预拉;S200、电梯箱模安装;S300、泵管支撑架设;S400、智能测温系统布置;S500、整体斜面分层浇筑;S600、循环水养护系统安装,最后直至大厚度底板浇筑完成,其中冷却水箱上设有水源进口,养护水管位于大厚度底板的顶端位置,预埋冷却水管位于大厚度底板的中下部。本申请具有提高大厚度底板钢筋绑扎、基坑模板支设、混凝土浇筑、养护的施工质量和施工效率的优点。
Large-thickness continuous seamless pouring concrete bottom plate and construction method thereof
大厚度连续无缝浇筑混凝土底板及其施工方法
YOU HOUFEI ( Autor:in ) / GUO BIN ( Autor:in ) / ZHAO LONG ( Autor:in ) / ZHAO YUAN ( Autor:in ) / CHENG XIURU ( Autor:in ) / SUN ZHANGYU ( Autor:in ) / CHEN HEBINGSEN ( Autor:in ) / XU WENTAO ( Autor:in ) / ZHANG YAJUAN ( Autor:in )
01.04.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Large-volume and large-height concrete continuous pouring construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Floor concrete pouring thickness control device and construction method thereof
Europäisches Patentamt | 2021
|