High-rise building glass curtain wall building structure and method
The invention discloses a high-rise building glass curtain wall building structure and method, and belongs to the technical field of glass curtain wall building. The high-rise building comprises the ground, a high-rise building body, a first lifting frame and a second lifting frame, the high-rise building body is arranged at the top of the ground, the first lifting frame is fixedly installed at the top of the high-rise building body through bolts, and the position, close to one side of the high-rise building body, of the top of the ground is fixedly installed on the second lifting frame through bolts; and motors are fixedly connected to the outer walls of one sides of the first lifting frame and the second lifting frame through bolts. Through mutual cooperation of the two first hoisting frames and the two second hoisting frames, it can be guaranteed that glass is in a stable state during hoisting, it is guaranteed that stress on the glass is always in a hoisting state horizontal to a high-rise building body, impact damage caused by glass shaking is avoided, and the glass hoisting device is suitable for building of glass curtain walls of the high-rise building; the problem that a traditional crane is not high enough and cannot conduct hoisting is solved.
本发明公开了一种高层建筑玻璃幕墙搭建结构及方法,属于玻璃幕墙搭建技术领域。本发明包括地面、高层建筑体、第一吊装架和第二吊装架,高层建筑体设置在地面的顶部,第一吊装架通过螺栓安装固定在高层建筑体的顶部,地面的顶部靠近高层建筑体的一侧位置处通过螺栓安装固定在第二吊装架,第一吊装架和第二吊装架的一侧外壁上均通过螺栓固定连接有电机。本发明通过两个第一吊装架和两个第二吊装架的相互配合,不仅可以保证玻璃在吊装时处于稳定的状态,保证玻璃受力一直与高层建筑体处于相水平的吊装状态,避免玻璃晃动造成撞击损坏,适应高层建筑玻璃幕墙的搭建,避免传统的吊车高度不够无法进行吊装的问题。
High-rise building glass curtain wall building structure and method
The invention discloses a high-rise building glass curtain wall building structure and method, and belongs to the technical field of glass curtain wall building. The high-rise building comprises the ground, a high-rise building body, a first lifting frame and a second lifting frame, the high-rise building body is arranged at the top of the ground, the first lifting frame is fixedly installed at the top of the high-rise building body through bolts, and the position, close to one side of the high-rise building body, of the top of the ground is fixedly installed on the second lifting frame through bolts; and motors are fixedly connected to the outer walls of one sides of the first lifting frame and the second lifting frame through bolts. Through mutual cooperation of the two first hoisting frames and the two second hoisting frames, it can be guaranteed that glass is in a stable state during hoisting, it is guaranteed that stress on the glass is always in a hoisting state horizontal to a high-rise building body, impact damage caused by glass shaking is avoided, and the glass hoisting device is suitable for building of glass curtain walls of the high-rise building; the problem that a traditional crane is not high enough and cannot conduct hoisting is solved.
本发明公开了一种高层建筑玻璃幕墙搭建结构及方法,属于玻璃幕墙搭建技术领域。本发明包括地面、高层建筑体、第一吊装架和第二吊装架,高层建筑体设置在地面的顶部,第一吊装架通过螺栓安装固定在高层建筑体的顶部,地面的顶部靠近高层建筑体的一侧位置处通过螺栓安装固定在第二吊装架,第一吊装架和第二吊装架的一侧外壁上均通过螺栓固定连接有电机。本发明通过两个第一吊装架和两个第二吊装架的相互配合,不仅可以保证玻璃在吊装时处于稳定的状态,保证玻璃受力一直与高层建筑体处于相水平的吊装状态,避免玻璃晃动造成撞击损坏,适应高层建筑玻璃幕墙的搭建,避免传统的吊车高度不够无法进行吊装的问题。
High-rise building glass curtain wall building structure and method
一种高层建筑玻璃幕墙搭建结构及方法
WANG HAO (Autor:in) / JIA DONGFENG (Autor:in) / ZHANG WENJU (Autor:in) / GONG JIANLU (Autor:in)
05.09.2023
Patent
Elektronische Ressource
Chinesisch
Optimization method of high-rise building glass curtain wall structure
Europäisches Patentamt | 2021
|Wall surface of high-rise glass curtain wall building
Europäisches Patentamt | 2024
|High-rise building curtain wall glass installation construction method
Europäisches Patentamt | 2021
|High-rise building glass curtain wall cleaning device
Europäisches Patentamt | 2022
|Environment-friendly glass curtain wall for high-rise building
Europäisches Patentamt | 2020
|