Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The vibration pile hammer for the building construction foundation comprises a top base, a first belt and a second belt, two sets of telescopic connecting rods are symmetrically installed at the two ends of the bottom of the top base relative to the vertical axis of the top base correspondingly, and each set of telescopic connecting rods are provided with two telescopic connecting rods relative to the vertical axis of the top base; the motor is installed at the bottom of the top base, power of the motor is transmitted to the transmission roller through the first belt, and due to the fact that good tension needs to be kept between the first belt and the transmission roller in the power transmission process, in the using process, the transmission speed is high; a second reset spring automatically drives a first transmission shaft and a second driven roller to synchronously slide through self contraction, so that the second driven roller is always tightly attached to the first belt, the first belt is always kept good tension to ensure the transmission effect, meanwhile, the influence of vibration on the motor can be effectively reduced during use, and the service life of the motor is prolonged. And the service life of the motor is effectively prolonged.
本发明公开一种建筑施工地基用振动桩锤,包括顶座、第一皮带和第二皮带,所述的顶座的底部两端分别关于顶座的竖直轴心线呈对称式安装有两组伸缩连杆,且每组伸缩连杆均关于顶座的竖直轴心线设有两个;本发明中,电机安装在顶座的底部,电机的动力通过第一皮带传输至传动辊,由于在动力传输的过程中,第一皮带与传动辊之间需要保持良好的张力,在使用的过程中,第二复位弹簧通过自身的收缩自动带动第一传动轴和第二从动辊同步滑动,使第二从动辊始终保持紧贴第一皮带,确保第一皮带始终保持良好的张力,以确保传动效果,同时在使用时可以有效降低震动对电机造成的影响,有效提高电机的使用寿命。
The vibration pile hammer for the building construction foundation comprises a top base, a first belt and a second belt, two sets of telescopic connecting rods are symmetrically installed at the two ends of the bottom of the top base relative to the vertical axis of the top base correspondingly, and each set of telescopic connecting rods are provided with two telescopic connecting rods relative to the vertical axis of the top base; the motor is installed at the bottom of the top base, power of the motor is transmitted to the transmission roller through the first belt, and due to the fact that good tension needs to be kept between the first belt and the transmission roller in the power transmission process, in the using process, the transmission speed is high; a second reset spring automatically drives a first transmission shaft and a second driven roller to synchronously slide through self contraction, so that the second driven roller is always tightly attached to the first belt, the first belt is always kept good tension to ensure the transmission effect, meanwhile, the influence of vibration on the motor can be effectively reduced during use, and the service life of the motor is prolonged. And the service life of the motor is effectively prolonged.
本发明公开一种建筑施工地基用振动桩锤,包括顶座、第一皮带和第二皮带,所述的顶座的底部两端分别关于顶座的竖直轴心线呈对称式安装有两组伸缩连杆,且每组伸缩连杆均关于顶座的竖直轴心线设有两个;本发明中,电机安装在顶座的底部,电机的动力通过第一皮带传输至传动辊,由于在动力传输的过程中,第一皮带与传动辊之间需要保持良好的张力,在使用的过程中,第二复位弹簧通过自身的收缩自动带动第一传动轴和第二从动辊同步滑动,使第二从动辊始终保持紧贴第一皮带,确保第一皮带始终保持良好的张力,以确保传动效果,同时在使用时可以有效降低震动对电机造成的影响,有效提高电机的使用寿命。
Vibrating pile hammer for building construction foundation
一种建筑施工地基用振动桩锤
08.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Vibrating pile hammer integrating feeding, overturning, clamping and pile sinking
Europäisches Patentamt | 2021
|Construction method for vibrating and sinking precast concrete pile through vibratory hammer
Europäisches Patentamt | 2024
|