Offshore wind power pile group bearing platform foundation measuring and positioning method
The invention discloses a method for measuring and positioning an offshore wind power group pile cap foundation, which relates to the technical field of offshore wind power group pile cap foundation measurement and positioning, and is characterized in that a control network is arranged on the periphery of a wind power plant to ensure and guide the lofting and detail measurement of each axis of the wind power plant; comprising the following steps: step 1, arranging a control network on the peripheral land of a wind power plant by adopting a lead method according to the overall layout, shape, main point location, axis size, site condition, positioning condition and construction scheme of a project; 2, measuring offshore coordinates according to the planning of the whole project, and guiding pile foundation coordinates of offshore wind power from land control points to the offshore coordinates; and step 3, the piling barge performs inserting and piling at the positioned coordinates. According to the technology, the problem that the base station is too far away from an open water area far away from the shore and even cannot be erected is solved, and meanwhile the safety, quality and efficiency of construction are guaranteed.
本发明公开了一种海上风电群桩承台基础测量定位方法,涉及海上风电群桩承台基础测量定位技术领域,在风电场的外围布设控制网以确保和指导风电场各轴线放样和细部测量,包括以下步骤:步骤1、根据工程的整体布局、形状、主要点位、轴线尺寸和场地情况、定位条件以及施工方案,在风电场的外围陆地采用导线法布设控制网;步骤2,根据整体项目的规划,测量海上坐标,将海上风电的桩基坐标从陆地控制点引至海上坐标;步骤3,打桩驳船在定好位的坐标进行插打。该技术解决了在离岸较远的开阔水域基准站距离过远甚至无法架设基准站的问题,同时保证施工的安全、质量、效率。
Offshore wind power pile group bearing platform foundation measuring and positioning method
The invention discloses a method for measuring and positioning an offshore wind power group pile cap foundation, which relates to the technical field of offshore wind power group pile cap foundation measurement and positioning, and is characterized in that a control network is arranged on the periphery of a wind power plant to ensure and guide the lofting and detail measurement of each axis of the wind power plant; comprising the following steps: step 1, arranging a control network on the peripheral land of a wind power plant by adopting a lead method according to the overall layout, shape, main point location, axis size, site condition, positioning condition and construction scheme of a project; 2, measuring offshore coordinates according to the planning of the whole project, and guiding pile foundation coordinates of offshore wind power from land control points to the offshore coordinates; and step 3, the piling barge performs inserting and piling at the positioned coordinates. According to the technology, the problem that the base station is too far away from an open water area far away from the shore and even cannot be erected is solved, and meanwhile the safety, quality and efficiency of construction are guaranteed.
本发明公开了一种海上风电群桩承台基础测量定位方法,涉及海上风电群桩承台基础测量定位技术领域,在风电场的外围布设控制网以确保和指导风电场各轴线放样和细部测量,包括以下步骤:步骤1、根据工程的整体布局、形状、主要点位、轴线尺寸和场地情况、定位条件以及施工方案,在风电场的外围陆地采用导线法布设控制网;步骤2,根据整体项目的规划,测量海上坐标,将海上风电的桩基坐标从陆地控制点引至海上坐标;步骤3,打桩驳船在定好位的坐标进行插打。该技术解决了在离岸较远的开阔水域基准站距离过远甚至无法架设基准站的问题,同时保证施工的安全、质量、效率。
Offshore wind power pile group bearing platform foundation measuring and positioning method
一种海上风电群桩承台基础测量定位方法
LIU CHAOWEN (Autor:in) / ZHANG DAIMING (Autor:in) / YI WANJIAN (Autor:in) / WANG PENGFEI (Autor:in)
08.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020