Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Casing pipe pre-embedded centering positioner and construction method thereof
The invention discloses a casing pipe pre-burying centering positioner and a construction method thereof, the distance between two movable plates is adjusted through a rotating shaft, so that the casing pipe pre-burying centering positioner is stably arranged between a to-be-installed hole channel and a pre-buried casing pipe, and after the rotating shafts of distance adjusting assemblies of multiple sets of casing pipe pre-burying centering positioners rotate by the same angle, the casing pipe pre-burying centering positioner can be fixed. And the distance between the two movable plates can be quickly and synchronously adjusted, so that the pre-embedded sleeve is centered and mounted in a to-be-mounted hole channel, and the pre-embedded construction efficiency of the pre-embedded sleeve is improved. The problem that in the construction stage of the secondary structural wall of the building, the casing pipe pre-embedding installation efficiency is low is solved.
本发明公开了一种套管预埋居中定位器及其施工方法,通过转轴调节两活动板之间的距离,使得套管预埋居中定位器稳固地设置于待安装孔道和预埋套管之间,且在多套套管预埋居中定位器的调距组件的转轴转动同样角度后,能快速实现两活动板之间的距离同步调整,进而使得预埋套管对中安装于待安装孔道中,提高了预埋套管的预埋施工效率。本发明解决了建筑二次结构墙施工阶段套管预埋安装效率低的问题。
Casing pipe pre-embedded centering positioner and construction method thereof
The invention discloses a casing pipe pre-burying centering positioner and a construction method thereof, the distance between two movable plates is adjusted through a rotating shaft, so that the casing pipe pre-burying centering positioner is stably arranged between a to-be-installed hole channel and a pre-buried casing pipe, and after the rotating shafts of distance adjusting assemblies of multiple sets of casing pipe pre-burying centering positioners rotate by the same angle, the casing pipe pre-burying centering positioner can be fixed. And the distance between the two movable plates can be quickly and synchronously adjusted, so that the pre-embedded sleeve is centered and mounted in a to-be-mounted hole channel, and the pre-embedded construction efficiency of the pre-embedded sleeve is improved. The problem that in the construction stage of the secondary structural wall of the building, the casing pipe pre-embedding installation efficiency is low is solved.
本发明公开了一种套管预埋居中定位器及其施工方法,通过转轴调节两活动板之间的距离,使得套管预埋居中定位器稳固地设置于待安装孔道和预埋套管之间,且在多套套管预埋居中定位器的调距组件的转轴转动同样角度后,能快速实现两活动板之间的距离同步调整,进而使得预埋套管对中安装于待安装孔道中,提高了预埋套管的预埋施工效率。本发明解决了建筑二次结构墙施工阶段套管预埋安装效率低的问题。
Casing pipe pre-embedded centering positioner and construction method thereof
套管预埋居中定位器及其施工方法
HAO GUANNAN (Autor:in) / ZOU ZHENHUAN (Autor:in) / WANG SENYUAN (Autor:in) / GAO YONG (Autor:in) / DENG XIUXING (Autor:in) / LIU YUZHENG (Autor:in) / LONG DONG (Autor:in) / LI JUNLING (Autor:in) / CHEN BAIHUI (Autor:in)
12.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Self-closed casing pipe embedded construction device and construction method
Europäisches Patentamt | 2021
|Embedded casing pipe for railroad sleeper and using method of embedded casing pipe
Europäisches Patentamt | 2024
|Embedded joint structure for reserving closed casing pipe and construction method thereof
Europäisches Patentamt | 2021
|Well casing centering construction method for underground water monitoring well
Europäisches Patentamt | 2021
|Pipe centering device in sleeve and construction method thereof
Europäisches Patentamt | 2022
|