The invention relates to the technical field of building construction, in particular to a medical building underground pipe gallery electromechanical pipeline assembly type construction method which comprises the following steps: carrying out BIM comprehensive arrangement on pipe gallery electromechanical pipelines, carrying out pipeline modular processing, carrying out bearing support hanger lifting lug positioning installation, carrying out hoisting fixation, connecting pipeline compensation sections between modules, and finishing assembly module installation. The medical building underground pipe gallery electromechanical pipeline assembly type construction method has the beneficial effects that the number of needed machining parts such as pipe sections, pipe fittings and valves is accurately calculated, frameworks are purchased and formed at a time, waste or shortage of the frameworks is avoided, the mode of prefabricating modules in a factory is adopted, digitization and standardization of components are improved, and the construction efficiency is improved. And after being transported to the site, the module only needs hoisting, fixing and dismantling procedures, so that site welding work is reduced, construction risks are reduced, green and energy-saving effects are achieved, site personnel requirements are reduced, and personnel working efficiency and construction quality are improved.
本发明涉及建筑施工技术领域,具体为一种医疗建筑地下管廊机电管线装配式施工方法,包括以下步骤:对管廊机电管线进行BIM综合排布,管线模块化加工,承重支吊架吊耳定位安装,吊装固定,模块间管线补偿段连接,装配模块安装完毕;有益效果为:本发明提出的医疗建筑地下管廊机电管线装配式施工方法,所需管段、管件、阀门等加工件数量计算准确,构架采购一次成型,避免构架浪费或短缺,采用工厂预制模块的方式,提高构件数字化、标准化,模块运输至现场后只需吊装、固定、拆除工序,减少现场焊接工作,降低施工风险,绿色节能,减少现场人员需求,提升人员工作效率和施工质量。
The invention relates to the technical field of building construction, in particular to a medical building underground pipe gallery electromechanical pipeline assembly type construction method which comprises the following steps: carrying out BIM comprehensive arrangement on pipe gallery electromechanical pipelines, carrying out pipeline modular processing, carrying out bearing support hanger lifting lug positioning installation, carrying out hoisting fixation, connecting pipeline compensation sections between modules, and finishing assembly module installation. The medical building underground pipe gallery electromechanical pipeline assembly type construction method has the beneficial effects that the number of needed machining parts such as pipe sections, pipe fittings and valves is accurately calculated, frameworks are purchased and formed at a time, waste or shortage of the frameworks is avoided, the mode of prefabricating modules in a factory is adopted, digitization and standardization of components are improved, and the construction efficiency is improved. And after being transported to the site, the module only needs hoisting, fixing and dismantling procedures, so that site welding work is reduced, construction risks are reduced, green and energy-saving effects are achieved, site personnel requirements are reduced, and personnel working efficiency and construction quality are improved.
本发明涉及建筑施工技术领域,具体为一种医疗建筑地下管廊机电管线装配式施工方法,包括以下步骤:对管廊机电管线进行BIM综合排布,管线模块化加工,承重支吊架吊耳定位安装,吊装固定,模块间管线补偿段连接,装配模块安装完毕;有益效果为:本发明提出的医疗建筑地下管廊机电管线装配式施工方法,所需管段、管件、阀门等加工件数量计算准确,构架采购一次成型,避免构架浪费或短缺,采用工厂预制模块的方式,提高构件数字化、标准化,模块运输至现场后只需吊装、固定、拆除工序,减少现场焊接工作,降低施工风险,绿色节能,减少现场人员需求,提升人员工作效率和施工质量。
Medical building underground pipe gallery electromechanical pipeline assembly type construction method
一种医疗建筑地下管廊机电管线装配式施工方法
ZU LINXUE (Autor:in)
15.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Sewage pipeline structure for underground pipe gallery construction