Integrated rapid installation and construction method for fabricated steel structure gate tower
The invention discloses an integrated rapid installation and construction method for a fabricated steel structure gate tower. The integrated rapid installation and construction method comprises the following steps that S1, surveying and setting out are conducted according to a design drawing; s2, supporting columns on the two sides of the gate tower are built, and meanwhile a steel framework of a cross beam is prefabricated in the prefabricating area; s3, steel channels are fixed to the tops of the supporting columns; s4, the steel cross frame is hoisted to the top of the supporting column through a hoisting mechanism; s5, after the steel framework reaches the preset position, spot welding is conducted on the steel framework and channel steel at the top of the supporting column; s6, full-length welding is conducted on the connecting positions of the steel framework and the steel channels of the supporting columns; s7, the reinforcement cage is hoisted to the top of the steel cross frame through a hoisting mechanism and fixed; s8, a pouring formwork of the supporting columns and the cross beams is built; and S9, concrete is poured into the built formwork, and the formwork is removed after the concrete is solidified. The construction method has the effects of improving the construction efficiency of the fabricated steel structure gate tower and reducing construction potential safety hazards.
本发明公开了一种装配式钢结构门楼一体化快速安装施工方法,包括以下步骤:步骤S1:根据设计图纸测量放线;步骤S2:搭建门楼两侧的支撑柱,同时在预制区预制横梁的钢骨架;步骤S3:在支撑柱顶部固定槽钢;步骤S4:利用吊装机构钢横架吊装至支撑柱顶部;步骤S5:钢骨架到达预定位置后,将钢骨架与支撑柱顶部的槽钢点焊;步骤S6:将钢骨架与支撑柱的槽钢连接处满焊;步骤S7:利用吊装机构将钢筋笼吊装至钢横架的顶部并固定;步骤S8:搭建支撑柱和横梁的浇筑模板;步骤S9:向搭建完成的模板浇筑混凝土,混凝土凝固后拆模。本申请具有提高装配式钢结构门楼施工效率以及减少施工安全隐患的效果。
Integrated rapid installation and construction method for fabricated steel structure gate tower
The invention discloses an integrated rapid installation and construction method for a fabricated steel structure gate tower. The integrated rapid installation and construction method comprises the following steps that S1, surveying and setting out are conducted according to a design drawing; s2, supporting columns on the two sides of the gate tower are built, and meanwhile a steel framework of a cross beam is prefabricated in the prefabricating area; s3, steel channels are fixed to the tops of the supporting columns; s4, the steel cross frame is hoisted to the top of the supporting column through a hoisting mechanism; s5, after the steel framework reaches the preset position, spot welding is conducted on the steel framework and channel steel at the top of the supporting column; s6, full-length welding is conducted on the connecting positions of the steel framework and the steel channels of the supporting columns; s7, the reinforcement cage is hoisted to the top of the steel cross frame through a hoisting mechanism and fixed; s8, a pouring formwork of the supporting columns and the cross beams is built; and S9, concrete is poured into the built formwork, and the formwork is removed after the concrete is solidified. The construction method has the effects of improving the construction efficiency of the fabricated steel structure gate tower and reducing construction potential safety hazards.
本发明公开了一种装配式钢结构门楼一体化快速安装施工方法,包括以下步骤:步骤S1:根据设计图纸测量放线;步骤S2:搭建门楼两侧的支撑柱,同时在预制区预制横梁的钢骨架;步骤S3:在支撑柱顶部固定槽钢;步骤S4:利用吊装机构钢横架吊装至支撑柱顶部;步骤S5:钢骨架到达预定位置后,将钢骨架与支撑柱顶部的槽钢点焊;步骤S6:将钢骨架与支撑柱的槽钢连接处满焊;步骤S7:利用吊装机构将钢筋笼吊装至钢横架的顶部并固定;步骤S8:搭建支撑柱和横梁的浇筑模板;步骤S9:向搭建完成的模板浇筑混凝土,混凝土凝固后拆模。本申请具有提高装配式钢结构门楼施工效率以及减少施工安全隐患的效果。
Integrated rapid installation and construction method for fabricated steel structure gate tower
一种装配式钢结构门楼一体化快速安装施工方法
DENG GANG (Autor:in) / ZHANG LEPING (Autor:in) / XUE QIANG (Autor:in) / YIN YICHAO (Autor:in) / WANG DINGXIANG (Autor:in) / WU FAN (Autor:in) / XIAO ZHOU (Autor:in)
19.09.2023
Patent
Elektronische Ressource
Chinesisch
Fabricated steel structure building gate tower and construction method thereof
Europäisches Patentamt | 2023
|Embedded type rapid installation construction method for fabricated steel structure stairs
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|TOWER FABRICATED STRUCTURE FOR WIND TURBINE INSTALLATION
Europäisches Patentamt | 2018
|