The invention discloses a vibroflotation construction method capable of obtaining the whole pile diameter of a gravel pile, and the vibroflotation construction of a gravel pile hole is rapidly completed by controlling the launching of a vibroflotation gravel pile machine comprising a telescopic guide rod and a vibroflotation device. Gravel fillers are placed in the gravel pile holes in batches, the gravel fillers placed in the gravel pile holes in batches are subjected to vibroflotation densification one by one through the vibroflotation device, and N gravel pile sections are formed; the pile diameter of each gravel pile section is calculated and stored according to the filling amount of the gravel filling materials placed in the gravel pile holes in each batch; and splicing and integrating the pile diameters of all the gravel pile sections obtained through calculation one by one to obtain the whole pile diameter of the gravel pile for marking the pile diameter of each gravel pile section, and completely displaying the whole pile diameter of the gravel pile.
本发明公开了一种可获得碎石桩整桩桩径的振冲施工方法,通过对包括伸缩导杆和振冲器的振冲碎石桩机的下水进行控制,快速完成碎石桩孔的振冲施工;将碎石填料分批次置入所述碎石桩孔中,通过所述振冲器逐一对分批次置入所述碎石桩孔中的碎石填料进行振冲加密,形成N个碎石桩段;利用每批次置入碎石桩孔内的碎石填料的填料量,计算并保存每个碎石桩段的桩径;通过将计算得到的所有碎石桩段桩径逐一进行拼接整合,得到分别标示每个碎石桩段桩径的碎石桩整桩桩径,并完整地显示碎石桩整桩桩径。
The invention discloses a vibroflotation construction method capable of obtaining the whole pile diameter of a gravel pile, and the vibroflotation construction of a gravel pile hole is rapidly completed by controlling the launching of a vibroflotation gravel pile machine comprising a telescopic guide rod and a vibroflotation device. Gravel fillers are placed in the gravel pile holes in batches, the gravel fillers placed in the gravel pile holes in batches are subjected to vibroflotation densification one by one through the vibroflotation device, and N gravel pile sections are formed; the pile diameter of each gravel pile section is calculated and stored according to the filling amount of the gravel filling materials placed in the gravel pile holes in each batch; and splicing and integrating the pile diameters of all the gravel pile sections obtained through calculation one by one to obtain the whole pile diameter of the gravel pile for marking the pile diameter of each gravel pile section, and completely displaying the whole pile diameter of the gravel pile.
本发明公开了一种可获得碎石桩整桩桩径的振冲施工方法,通过对包括伸缩导杆和振冲器的振冲碎石桩机的下水进行控制,快速完成碎石桩孔的振冲施工;将碎石填料分批次置入所述碎石桩孔中,通过所述振冲器逐一对分批次置入所述碎石桩孔中的碎石填料进行振冲加密,形成N个碎石桩段;利用每批次置入碎石桩孔内的碎石填料的填料量,计算并保存每个碎石桩段的桩径;通过将计算得到的所有碎石桩段桩径逐一进行拼接整合,得到分别标示每个碎石桩段桩径的碎石桩整桩桩径,并完整地显示碎石桩整桩桩径。
Vibroflotation construction method capable of obtaining whole pile diameter of gravel pile
一种可获得碎石桩整桩桩径的振冲施工方法
22.09.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Vibroflotation method capable of obtaining guaranteed pile diameter of gravel pile
Europäisches Patentamt | 2023
|Vibroflotation construction method for obtaining diameter of whole gravel pile
Europäisches Patentamt | 2024
|Vibroflotation method for obtaining gravel pile with guaranteed pile diameter
Europäisches Patentamt | 2024
|Vibroflotation construction method capable of ensuring effective pile diameter of gravel pile
Europäisches Patentamt | 2023
|Vibroflotation construction method capable of ensuring effective pile diameter of gravel pile
Europäisches Patentamt | 2023
|