Permanent and temporary combined construction method for new energy plant
The invention discloses a permanent and temporary combined construction method for a new energy plant, which relates to the technical field of building construction and comprises the following steps: S1, excavating and paving a soil foundation according to a construction required route, flattening and compacting the soil foundation, and paving a base layer for construction of a permanent section and a temporary section according to the construction route; s2, a water stable layer with the thickness of 150 mm and a C30 concrete layer with the thickness of 200 mm are sequentially laid on the base layer, during construction of a permanent laying road section, the concrete layer does not need to be crushed, an asphalt surface layer is directly laid on the concrete layer, and construction waste is reduced; the method has the beneficial effects that the formal fire-fighting pipe network is adopted as a framework to be matched with the temporary fire-fighting pipe network for construction of the on-site fire-fighting near-water system, and during formal fire-fighting construction, the fire hydrant box and the fire-fighting water pump connector can be used after being replaced, so that the purposes of reducing cost, increasing efficiency and saving resources are achieved.
本发明公开了一种新能源厂区永临结合施工方法,涉及建筑施工技术领域,包括以下步骤:S1:按照施工需要路线进行挖掘铺设土基,将土基碾平压实,根据施工路线铺设出供永久段和临时段施工的基层;S2:在基层上依次铺设150mm厚的水稳层和200mm厚的C30混凝土层,在永久铺设路段施工时,无需进行破碎混凝土层,直接在混凝土层上铺设沥青面层,减少建筑垃圾;本发明的有益效果是:采用正式消防管网为骨架和临时消防管网配合的方式进行现场消防临水系统的施工,正式消防施工时,只需将消火栓箱、消防水泵接口更换后即可通入使用,从而达到降本增效与节约资源的目的。
Permanent and temporary combined construction method for new energy plant
The invention discloses a permanent and temporary combined construction method for a new energy plant, which relates to the technical field of building construction and comprises the following steps: S1, excavating and paving a soil foundation according to a construction required route, flattening and compacting the soil foundation, and paving a base layer for construction of a permanent section and a temporary section according to the construction route; s2, a water stable layer with the thickness of 150 mm and a C30 concrete layer with the thickness of 200 mm are sequentially laid on the base layer, during construction of a permanent laying road section, the concrete layer does not need to be crushed, an asphalt surface layer is directly laid on the concrete layer, and construction waste is reduced; the method has the beneficial effects that the formal fire-fighting pipe network is adopted as a framework to be matched with the temporary fire-fighting pipe network for construction of the on-site fire-fighting near-water system, and during formal fire-fighting construction, the fire hydrant box and the fire-fighting water pump connector can be used after being replaced, so that the purposes of reducing cost, increasing efficiency and saving resources are achieved.
本发明公开了一种新能源厂区永临结合施工方法,涉及建筑施工技术领域,包括以下步骤:S1:按照施工需要路线进行挖掘铺设土基,将土基碾平压实,根据施工路线铺设出供永久段和临时段施工的基层;S2:在基层上依次铺设150mm厚的水稳层和200mm厚的C30混凝土层,在永久铺设路段施工时,无需进行破碎混凝土层,直接在混凝土层上铺设沥青面层,减少建筑垃圾;本发明的有益效果是:采用正式消防管网为骨架和临时消防管网配合的方式进行现场消防临水系统的施工,正式消防施工时,只需将消火栓箱、消防水泵接口更换后即可通入使用,从而达到降本增效与节约资源的目的。
Permanent and temporary combined construction method for new energy plant
一种新能源厂区永临结合施工方法
BO DONGDONG (Autor:in) / WANG BAO (Autor:in) / LI TONGLEI (Autor:in) / ZHANG CHUNXUE (Autor:in) / SHI YIN (Autor:in)
03.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E02D
FOUNDATIONS
,
Gründungen
/
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Plant road structure and secondary permanent and temporary combined layered construction method
Europäisches Patentamt | 2022
|Permanent and temporary combined cofferdam structure and construction method
Europäisches Patentamt | 2024
|Expressway permanent and temporary combined construction structure and construction method thereof
Europäisches Patentamt | 2024
|Permanent and temporary combined green construction method for underground structure
Europäisches Patentamt | 2024
|Permanent and temporary combined basement structure and construction method thereof
Europäisches Patentamt | 2024
|