Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge pier top fence mounting equipment and method
The invention discloses pier top fence mounting equipment and method, and belongs to the technical field of railway bridge construction, the pier top fence mounting equipment comprises a hanging fence mould, a hoisting truss, a guide device and positioning steel bars, the hanging fence mould comprises two parallel annular steel bars, and the annular steel bars are connected through a plurality of positioning columns; the hoisting truss comprises a first body and a second body, the first body and the second body are arranged in parallel and are fixed through a plurality of steel plates, the first body comprises two steel plates arranged in parallel, and a plurality of fixed pulleys are arranged between the steel plates; the second body adopts the same arrangement; the guide device comprises a steel plate, a U-shaped steel bar, a steel bar and a pulley; through holes are formed in the four corners of the steel plate, the two U-shaped steel bars penetrate through the through holes and are fixed to the steel plate through bolts, the steel bars are welded to the middle of the steel plate, and pulleys are arranged at one ends of the steel bars. The positioning steel bar comprises a positioning steel bar body and a sleeve, the sleeve is fixedly connected with the steel bar body, and internal threads are arranged in the sleeve; installation precision is high, batch line production can be achieved, and construction efficiency is improved.
本发明公开了一种桥墩墩顶围栏安装设备及方法,属于铁路桥梁施工技术领域,包括吊栏胎具、吊装桁架、导向装置和定位钢筋,吊栏胎具包括两个平行设置的环形钢筋,环形钢筋之间通过多个定位柱连接;吊装桁架包括第一本体和第二本体,第一本体和第二本体平行设置,通过多个钢板固定,第一本体包括两个平行设置的钢板,钢板之间设有多个定滑轮;第二本体采用相同设置;导向装置包括,钢板、U型钢筋、钢筋和滑轮;钢板四角设有通孔,两个U型钢筋穿过通孔通过螺栓固定在钢板上,钢筋焊接在钢板中间位置,钢筋一端设有滑轮;定位钢筋,包括定位钢筋本体和套筒,套筒与钢筋本体固定连接,套筒内设有内螺纹;安装精度高,可批量流水作业,增加施工效率。
Bridge pier top fence mounting equipment and method
The invention discloses pier top fence mounting equipment and method, and belongs to the technical field of railway bridge construction, the pier top fence mounting equipment comprises a hanging fence mould, a hoisting truss, a guide device and positioning steel bars, the hanging fence mould comprises two parallel annular steel bars, and the annular steel bars are connected through a plurality of positioning columns; the hoisting truss comprises a first body and a second body, the first body and the second body are arranged in parallel and are fixed through a plurality of steel plates, the first body comprises two steel plates arranged in parallel, and a plurality of fixed pulleys are arranged between the steel plates; the second body adopts the same arrangement; the guide device comprises a steel plate, a U-shaped steel bar, a steel bar and a pulley; through holes are formed in the four corners of the steel plate, the two U-shaped steel bars penetrate through the through holes and are fixed to the steel plate through bolts, the steel bars are welded to the middle of the steel plate, and pulleys are arranged at one ends of the steel bars. The positioning steel bar comprises a positioning steel bar body and a sleeve, the sleeve is fixedly connected with the steel bar body, and internal threads are arranged in the sleeve; installation precision is high, batch line production can be achieved, and construction efficiency is improved.
本发明公开了一种桥墩墩顶围栏安装设备及方法,属于铁路桥梁施工技术领域,包括吊栏胎具、吊装桁架、导向装置和定位钢筋,吊栏胎具包括两个平行设置的环形钢筋,环形钢筋之间通过多个定位柱连接;吊装桁架包括第一本体和第二本体,第一本体和第二本体平行设置,通过多个钢板固定,第一本体包括两个平行设置的钢板,钢板之间设有多个定滑轮;第二本体采用相同设置;导向装置包括,钢板、U型钢筋、钢筋和滑轮;钢板四角设有通孔,两个U型钢筋穿过通孔通过螺栓固定在钢板上,钢筋焊接在钢板中间位置,钢筋一端设有滑轮;定位钢筋,包括定位钢筋本体和套筒,套筒与钢筋本体固定连接,套筒内设有内螺纹;安装精度高,可批量流水作业,增加施工效率。
Bridge pier top fence mounting equipment and method
一种桥墩墩顶围栏安装设备及方法
LU LEI (Autor:in) / TONG XIANTAO (Autor:in) / CHANG LIANG (Autor:in) / NING XUYANG (Autor:in) / LEE SI WOO (Autor:in) / ZOU XUEAN (Autor:in) / LIU HONGYU (Autor:in) / ZU PEILU (Autor:in) / GAO XUEDONG (Autor:in) / FU CHANG (Autor:in)
17.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge pier hanging fence construction operation platform
Europäisches Patentamt | 2023
|Pier top hanging fence for pier of high-speed railway bridge
Europäisches Patentamt | 2020
|Method for fixedly connecting highway bridge pier support overhauling fence and pier
Europäisches Patentamt | 2020
|Guard Fence for Bridge Pier and Constructing Method of Such Guard Fence
Europäisches Patentamt | 2018
|Mounting operation platform for hanging fence at top of pier of high-speed railway bridge
Europäisches Patentamt | 2023
|