Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid reinforcement treatment process for highway grouting
The invention relates to a rapid reinforcement treatment process for grouting of a highway structure layer, which comprises the following steps of: checking pavement cracks, subsidence and slurry pumping positions on site, uniformly arranging drill holes at a highway pavement disease position and a position which is 2-3m away from the disease position according to a hole distance of 1.2-1.8 m, grouting to the pavement structure layer through a grouting device, and filling and compacting gaps and voids of the structure layer through slurry so as to achieve the purpose of reinforcing the structure layer. According to the technology, rapid repair of structural layer gaps and voids caused by pavement cracks, subsidence and slurry pumping is achieved, pavement structural layer reinforcement is rapidly achieved through checking, hole arrangement, hole drilling, slurry jacking and hole sealing, rapid repair of pavement structural layer gaps and voids is effectively achieved, roadbed disease development is truly effectively treated or inhibited, and the construction period is shortened. And secondary diseases are prevented.
公路结构层压浆快速加固处理工艺,根据现场查看路面裂缝、沉陷、唧浆位置,在公路路面病害处及病害外2‑3米处按1.2‑1.8米的孔距均匀布置钻孔,通过注浆器灌浆至路面结构层,通过浆液对结构层的空隙、脱空填充压密,达到结构层补强目的。本发明工艺实现了因路面裂缝、沉陷、唧浆导致结构层空隙、脱空的快速修复,通过查看、布孔、钻孔、压浆、封孔快速实现了路面结构层加固,有效的实现路面结构层空隙、脱空病害的快速修复,真正做到了有效治理或抑制路基病害发展,防止了次生病害发生的目的。
Rapid reinforcement treatment process for highway grouting
The invention relates to a rapid reinforcement treatment process for grouting of a highway structure layer, which comprises the following steps of: checking pavement cracks, subsidence and slurry pumping positions on site, uniformly arranging drill holes at a highway pavement disease position and a position which is 2-3m away from the disease position according to a hole distance of 1.2-1.8 m, grouting to the pavement structure layer through a grouting device, and filling and compacting gaps and voids of the structure layer through slurry so as to achieve the purpose of reinforcing the structure layer. According to the technology, rapid repair of structural layer gaps and voids caused by pavement cracks, subsidence and slurry pumping is achieved, pavement structural layer reinforcement is rapidly achieved through checking, hole arrangement, hole drilling, slurry jacking and hole sealing, rapid repair of pavement structural layer gaps and voids is effectively achieved, roadbed disease development is truly effectively treated or inhibited, and the construction period is shortened. And secondary diseases are prevented.
公路结构层压浆快速加固处理工艺,根据现场查看路面裂缝、沉陷、唧浆位置,在公路路面病害处及病害外2‑3米处按1.2‑1.8米的孔距均匀布置钻孔,通过注浆器灌浆至路面结构层,通过浆液对结构层的空隙、脱空填充压密,达到结构层补强目的。本发明工艺实现了因路面裂缝、沉陷、唧浆导致结构层空隙、脱空的快速修复,通过查看、布孔、钻孔、压浆、封孔快速实现了路面结构层加固,有效的实现路面结构层空隙、脱空病害的快速修复,真正做到了有效治理或抑制路基病害发展,防止了次生病害发生的目的。
Rapid reinforcement treatment process for highway grouting
公路压浆快速加固处理工艺
HE ZHENGFENG (Autor:in) / CHEN WEI (Autor:in) / LIU JIAN (Autor:in) / XIE HAIFENG (Autor:in) / WANG QI (Autor:in) / NIU NAN (Autor:in) / WANG GANG (Autor:in) / GUO WEI (Autor:in) / ZHANG XUAN (Autor:in) / YANG YANG (Autor:in)
20.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Existing highway embankment grouting reinforcement structure and construction method
Europäisches Patentamt | 2021
|Protection pressure limiting device in grouting reinforcement process and grouting method
Europäisches Patentamt | 2024
|Grouting Reinforcement Apparatus and Grouting Reinforcement Method Using the Same
Europäisches Patentamt | 2017
|