Method for installing dry coal shed net rack through single-hinge supporting rotation method
The invention relates to the technical field of a method for installing a dry coal shed net rack by a single-hinge support rotating method, in particular to a method for installing a dry coal shed net rack by a single-hinge support rotating method, which comprises the following specific steps of: transporting a proper amount of bolt balls and supports for supporting to an assembling site, assembling the bolt balls and the supports to form a bolt ball net rack, and assembling the bolt balls and the supports to form the dry coal shed net rack; corresponding bolt balls are marked as lower chord balls, segment balls and upper chord balls in a bolt ball net rack construction area according to a drawing in the length direction and the short direction of a net rack lower chord, the lower chord balls and the upper chord balls are sequentially numbered in advance from numbers 1, 2 and 3, the foundation axis size is rechecked, positioning is carried out, transformation of a starting span spherical hinge structure and ground splicing of the starting span net rack end are completed, and the starting span net rack end is formed. Hoisting the end part of the starting span net rack, sequentially assembling the starting net rack, re-checking the size, integrally folding the net rack, checking and accepting, and completing the installation of the remaining net rack. The construction efficiency is improved, erection of a scaffold or a construction platform is omitted, high-altitude operation is reduced, and use is convenient.
本发明涉及干煤棚网架单铰支撑旋转法安装的方法技术领域,具体地说,涉及一种干煤棚网架单铰支撑旋转法安装的方法,包括具体如下步骤:向拼装场地运输适量的螺栓球和用于支撑的支座,螺栓球与支座拼装构成螺栓球网架,在螺栓球网架施工区按图纸沿着网架下弦长向和短向,将对应的螺栓球标记为下弦球、节段球和上弦球,并将下弦球和上弦球分别预先依次从数字1、2、3...进行编号,复核基础轴线尺寸并定位,完成起步跨球铰结构的改造,起步跨网架端部地面拼装,吊装起步跨网架端部,依次拼装起步网架,复核尺寸,网架整体合拢,验收,完成剩余网架安装。本发明提高了施工效率,取消了脚手架或施工平台的搭设,减少高空作业,方便使用。
Method for installing dry coal shed net rack through single-hinge supporting rotation method
The invention relates to the technical field of a method for installing a dry coal shed net rack by a single-hinge support rotating method, in particular to a method for installing a dry coal shed net rack by a single-hinge support rotating method, which comprises the following specific steps of: transporting a proper amount of bolt balls and supports for supporting to an assembling site, assembling the bolt balls and the supports to form a bolt ball net rack, and assembling the bolt balls and the supports to form the dry coal shed net rack; corresponding bolt balls are marked as lower chord balls, segment balls and upper chord balls in a bolt ball net rack construction area according to a drawing in the length direction and the short direction of a net rack lower chord, the lower chord balls and the upper chord balls are sequentially numbered in advance from numbers 1, 2 and 3, the foundation axis size is rechecked, positioning is carried out, transformation of a starting span spherical hinge structure and ground splicing of the starting span net rack end are completed, and the starting span net rack end is formed. Hoisting the end part of the starting span net rack, sequentially assembling the starting net rack, re-checking the size, integrally folding the net rack, checking and accepting, and completing the installation of the remaining net rack. The construction efficiency is improved, erection of a scaffold or a construction platform is omitted, high-altitude operation is reduced, and use is convenient.
本发明涉及干煤棚网架单铰支撑旋转法安装的方法技术领域,具体地说,涉及一种干煤棚网架单铰支撑旋转法安装的方法,包括具体如下步骤:向拼装场地运输适量的螺栓球和用于支撑的支座,螺栓球与支座拼装构成螺栓球网架,在螺栓球网架施工区按图纸沿着网架下弦长向和短向,将对应的螺栓球标记为下弦球、节段球和上弦球,并将下弦球和上弦球分别预先依次从数字1、2、3...进行编号,复核基础轴线尺寸并定位,完成起步跨球铰结构的改造,起步跨网架端部地面拼装,吊装起步跨网架端部,依次拼装起步网架,复核尺寸,网架整体合拢,验收,完成剩余网架安装。本发明提高了施工效率,取消了脚手架或施工平台的搭设,减少高空作业,方便使用。
Method for installing dry coal shed net rack through single-hinge supporting rotation method
一种干煤棚网架单铰支撑旋转法安装的方法
XU JIE (Autor:in) / HOU TIWEI (Autor:in) / SONG SHOUYUAN (Autor:in) / LI JUNFENG (Autor:in) / SUN FENGZHEN (Autor:in) / WEI YING (Autor:in) / TANG YANXING (Autor:in)
24.10.2023
Patent
Elektronische Ressource
Chinesisch
Construction method for single-side arching of starting unit of large-span dry coal shed net rack