Construction method for single-side arching of starting unit of large-span dry coal shed net rack
According to the construction method for single-side arching of the starting unit of the large-span dry coal shed net rack, the starting unit can be continuously assembled from the support at one end to the support at the other end according to the shape of the arch net rack, and after a stable arch supporting structure is formed, the arch net rack can be supported by the support at the other end. A follow-up net rack takes an arched net rack as a supporting platform, high-altitude bulk or accumulative slippage is adopted, and in order to control the horizontal force and chord length of the arch foot position in the single-side arching process, tensioning cables are gradually increased according to the arching length of a starting unit. The construction method highlights the characteristics of small occupied area, high construction speed, low cost, low safety risk, high construction quality and the like in the operation process.
本发明提供了一种大跨度干煤棚网架起步单元单侧起拱的施工方法,能够根据拱形网架的自身形状,起步单元采用从一端支座延续拼装至另一端支座,形成稳定的拱形支撑结构后,后续网架以拱形网架作为支撑平台采用高空散装或者累计滑移,单侧成拱过程中为了控制拱脚位置的水平力及弦长,根据起步单元的成拱长度逐渐增加张紧索。本施工方法突显了作业过程占用场地少,施工速度快,费用低,安全风险低,施工质量高等特点。
Construction method for single-side arching of starting unit of large-span dry coal shed net rack
According to the construction method for single-side arching of the starting unit of the large-span dry coal shed net rack, the starting unit can be continuously assembled from the support at one end to the support at the other end according to the shape of the arch net rack, and after a stable arch supporting structure is formed, the arch net rack can be supported by the support at the other end. A follow-up net rack takes an arched net rack as a supporting platform, high-altitude bulk or accumulative slippage is adopted, and in order to control the horizontal force and chord length of the arch foot position in the single-side arching process, tensioning cables are gradually increased according to the arching length of a starting unit. The construction method highlights the characteristics of small occupied area, high construction speed, low cost, low safety risk, high construction quality and the like in the operation process.
本发明提供了一种大跨度干煤棚网架起步单元单侧起拱的施工方法,能够根据拱形网架的自身形状,起步单元采用从一端支座延续拼装至另一端支座,形成稳定的拱形支撑结构后,后续网架以拱形网架作为支撑平台采用高空散装或者累计滑移,单侧成拱过程中为了控制拱脚位置的水平力及弦长,根据起步单元的成拱长度逐渐增加张紧索。本施工方法突显了作业过程占用场地少,施工速度快,费用低,安全风险低,施工质量高等特点。
Construction method for single-side arching of starting unit of large-span dry coal shed net rack
一种大跨度干煤棚网架起步单元单侧起拱的施工方法
WANG YI (Autor:in) / HU PENGCHENG (Autor:in)
11.06.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method for starting unit of middle lifting and arching net rack
Europäisches Patentamt | 2022
|Construction method of large-span net rack starting rack
Europäisches Patentamt | 2021
|Arching device for large-span beam and construction method
Europäisches Patentamt | 2023
|Construction method for starting installation of large-span arched net rack
Europäisches Patentamt | 2024
|Construction method of super-large-span dry coal shed grid structure
Europäisches Patentamt | 2022
|