Prefabricated concrete gyro pile raft square culvert foundation construction method
The invention provides a prefabricated concrete gyro pile raft square culvert foundation construction method. The method sequentially comprises the following steps that S1, construction preparation is conducted; s2, gyro pile prefabrication; s3, construction paying-off is carried out; s4, mounting a gyro pile; s5, concrete raft plate pouring; s6, prefabricating the box culvert; s7, surveying and setting out; s8, mounting the prefabricated box culvert; and S9, plain soil backfilling. The invention has the following beneficial effects: the bearing performance is high; the manufacturing cost is low; the prefabricated gyro piles are adopted, the construction efficiency is high, the on-site wet construction amount is small, good environment friendliness is achieved, the basic requirement of green construction is met, construction is hardly affected by seasons and weather, and construction can be conducted all the year round.
本发明提供了一种预制混凝土陀螺桩筏板方涵基础建造方法,依次包括以下步骤:S1、施工准备;S2、陀螺桩预制;S3、施工放线;S4、陀螺桩安装;S5、混凝土筏板浇筑;S6、箱涵预制;S7、测量放线;S8、预制箱涵安装;S9、素土回填。本发明的有益效果在于:承载性能高;造价较低;采用预制陀螺桩,施工效率高、现场湿作业量小,具有较好的环境友好性,符合绿色施工的基本要求,而且施工几乎不受季节天气的影响,全年皆可施工。
Prefabricated concrete gyro pile raft square culvert foundation construction method
The invention provides a prefabricated concrete gyro pile raft square culvert foundation construction method. The method sequentially comprises the following steps that S1, construction preparation is conducted; s2, gyro pile prefabrication; s3, construction paying-off is carried out; s4, mounting a gyro pile; s5, concrete raft plate pouring; s6, prefabricating the box culvert; s7, surveying and setting out; s8, mounting the prefabricated box culvert; and S9, plain soil backfilling. The invention has the following beneficial effects: the bearing performance is high; the manufacturing cost is low; the prefabricated gyro piles are adopted, the construction efficiency is high, the on-site wet construction amount is small, good environment friendliness is achieved, the basic requirement of green construction is met, construction is hardly affected by seasons and weather, and construction can be conducted all the year round.
本发明提供了一种预制混凝土陀螺桩筏板方涵基础建造方法,依次包括以下步骤:S1、施工准备;S2、陀螺桩预制;S3、施工放线;S4、陀螺桩安装;S5、混凝土筏板浇筑;S6、箱涵预制;S7、测量放线;S8、预制箱涵安装;S9、素土回填。本发明的有益效果在于:承载性能高;造价较低;采用预制陀螺桩,施工效率高、现场湿作业量小,具有较好的环境友好性,符合绿色施工的基本要求,而且施工几乎不受季节天气的影响,全年皆可施工。
Prefabricated concrete gyro pile raft square culvert foundation construction method
一种预制混凝土陀螺桩筏板方涵基础建造方法
RONG WANJIANG (Autor:in) / ZHAO FENG (Autor:in) / YANG JIANMING (Autor:in) / HUA FUYU (Autor:in) / XUE GUOHUI (Autor:in)
31.10.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Raft foundation construction method for pile foundation detection and prefabricated raft
Europäisches Patentamt | 2021
|Pile foundation prefabricated concrete square block wall type revetment and construction method
Europäisches Patentamt | 2021
|Prefabricated raft foundation and construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|