Construction method for W-shaped steel structure curved roof
The invention discloses a construction method for a W-shaped steel structure curved roof. The construction method comprises the following steps that S1, construction preparation is conducted; s2, establishing a model; s3, hoisting a first-stage forked column; s4, hoisting a second-stage forked column; s5, the edge sealing steel beam and the inner ring partition steel beam supporting tire are installed; s6, a full-space supporting frame is erected; s7, edge sealing steel beam hoisting; s8, inner ring partition steel beam hoisting; s9, mounting a through steel beam; s10, mounting the inlaying steel beam; s11, a third-stage forked column is installed; s12, the steel structure curved surface roof is unloaded; according to the hoisting construction method, the technical problems that in the hoisting construction stage of the W-shaped steel structure curved surface roof, a climbing vehicle cannot be adopted for operation, and the operation space of a truck crane is limited are solved.
本发明公开一种用于W形钢结构曲面屋盖施工方法,包括如下步骤:S1、施工准备;S2、建立模型;S3、一级分叉柱吊装;S4、二级分叉柱吊装;S5、封边钢梁与内圈分区钢梁支撑胎安装;S6、满堂支撑架搭设;S7、封边钢梁吊装;S8、内圈分区钢梁吊装;S9、贯通钢梁安装;S10、嵌补钢梁安装;S11、三级分叉柱安装;S12、钢结构曲面屋盖卸载;S13、验收,本发明解决了在W形钢结构曲面屋盖吊装施工阶段,解决无法采用登高车辆作业、汽车吊作业空间受限的技术问题。
Construction method for W-shaped steel structure curved roof
The invention discloses a construction method for a W-shaped steel structure curved roof. The construction method comprises the following steps that S1, construction preparation is conducted; s2, establishing a model; s3, hoisting a first-stage forked column; s4, hoisting a second-stage forked column; s5, the edge sealing steel beam and the inner ring partition steel beam supporting tire are installed; s6, a full-space supporting frame is erected; s7, edge sealing steel beam hoisting; s8, inner ring partition steel beam hoisting; s9, mounting a through steel beam; s10, mounting the inlaying steel beam; s11, a third-stage forked column is installed; s12, the steel structure curved surface roof is unloaded; according to the hoisting construction method, the technical problems that in the hoisting construction stage of the W-shaped steel structure curved surface roof, a climbing vehicle cannot be adopted for operation, and the operation space of a truck crane is limited are solved.
本发明公开一种用于W形钢结构曲面屋盖施工方法,包括如下步骤:S1、施工准备;S2、建立模型;S3、一级分叉柱吊装;S4、二级分叉柱吊装;S5、封边钢梁与内圈分区钢梁支撑胎安装;S6、满堂支撑架搭设;S7、封边钢梁吊装;S8、内圈分区钢梁吊装;S9、贯通钢梁安装;S10、嵌补钢梁安装;S11、三级分叉柱安装;S12、钢结构曲面屋盖卸载;S13、验收,本发明解决了在W形钢结构曲面屋盖吊装施工阶段,解决无法采用登高车辆作业、汽车吊作业空间受限的技术问题。
Construction method for W-shaped steel structure curved roof
一种用于W形钢结构曲面屋盖施工方法
ZHOU LIFANG (Autor:in) / LI JIAPENG (Autor:in) / XU CHAOFENG (Autor:in) / LIU YIKANG (Autor:in) / WU DEBAO (Autor:in) / CHEN XIAOWEN (Autor:in)
03.11.2023
Patent
Elektronische Ressource
Chinesisch
Construction method of fan-shaped roof steel structure and fan-shaped roof steel structure
Europäisches Patentamt | 2024
|Special-shaped curved slope roof safety protection structure system and construction method
Europäisches Patentamt | 2024
|Curved special-shaped metal roof of stadium and construction method
Europäisches Patentamt | 2024
|Construction method of special-shaped curved surface concrete roof panel
Europäisches Patentamt | 2023
|