Construction method of fan-shaped roof steel structure and fan-shaped roof steel structure
The construction method comprises the following steps that the middle section of a steel beam on the bottommost layer is installed on a middle supporting column, a temporary support is erected between the middle supporting column and a side column of the steel beam on the bottommost layer, and the two end sections of the steel beam on the bottommost layer are hoisted to the temporary support; the two end sections of the bottommost steel beam are fixed to the corresponding middle sections and the corresponding side columns correspondingly; the bottommost steel beam serves as a temporary support, all layers of steel beams are sequentially stacked and assembled in the direction from bottom to top, the middle sections of the steel beams are installed on the middle supporting columns, and the inner ends of the two end sections of each steel beam are fixed to the corresponding middle sections; according to the construction method, the steel beams on all layers are unfolded to form a folding fan-shaped structure, the steel beams on all layers are fixed to the corresponding side columns, the construction cost is reduced by adopting the construction method, and the construction period is shortened.
本发明涉及一种扇形屋盖钢结构的施工方法及扇形屋盖钢结构,包括以下步骤:在中间支撑柱安装最底层的钢梁的中间段,在中间支撑柱和最底层钢梁的边柱之间搭设临时支架,吊装最底层钢梁的两端段至临时支架,将最底层钢梁的两端段分别与对应的中间段和边柱固定;以最底层钢梁作为临时支撑,沿由下至上方向,依次堆叠组装各层钢梁,其中钢梁的中间段安装在中间支撑柱上,钢梁的两端段内端部与对应的中间段固定;将各层钢梁展开形成折扇型结构,将各层钢梁与对应的边柱进行固定,采用本发明的施工方法降低了施工成本、缩短了施工周期。
Construction method of fan-shaped roof steel structure and fan-shaped roof steel structure
The construction method comprises the following steps that the middle section of a steel beam on the bottommost layer is installed on a middle supporting column, a temporary support is erected between the middle supporting column and a side column of the steel beam on the bottommost layer, and the two end sections of the steel beam on the bottommost layer are hoisted to the temporary support; the two end sections of the bottommost steel beam are fixed to the corresponding middle sections and the corresponding side columns correspondingly; the bottommost steel beam serves as a temporary support, all layers of steel beams are sequentially stacked and assembled in the direction from bottom to top, the middle sections of the steel beams are installed on the middle supporting columns, and the inner ends of the two end sections of each steel beam are fixed to the corresponding middle sections; according to the construction method, the steel beams on all layers are unfolded to form a folding fan-shaped structure, the steel beams on all layers are fixed to the corresponding side columns, the construction cost is reduced by adopting the construction method, and the construction period is shortened.
本发明涉及一种扇形屋盖钢结构的施工方法及扇形屋盖钢结构,包括以下步骤:在中间支撑柱安装最底层的钢梁的中间段,在中间支撑柱和最底层钢梁的边柱之间搭设临时支架,吊装最底层钢梁的两端段至临时支架,将最底层钢梁的两端段分别与对应的中间段和边柱固定;以最底层钢梁作为临时支撑,沿由下至上方向,依次堆叠组装各层钢梁,其中钢梁的中间段安装在中间支撑柱上,钢梁的两端段内端部与对应的中间段固定;将各层钢梁展开形成折扇型结构,将各层钢梁与对应的边柱进行固定,采用本发明的施工方法降低了施工成本、缩短了施工周期。
Construction method of fan-shaped roof steel structure and fan-shaped roof steel structure
一种扇形屋盖钢结构的施工方法及扇形屋盖钢结构
WANG SHULEI (Autor:in) / WANG KANG (Autor:in) / YANG WEIKE (Autor:in) / XUE DONGHAI (Autor:in) / YANG LEJIE (Autor:in) / SUN ZHE (Autor:in) / WANG WEIWEI (Autor:in) / ZONG ZHU (Autor:in) / ZHANG KUAN (Autor:in) / JIA QIANG (Autor:in)
26.11.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for W-shaped steel structure curved roof
Europäisches Patentamt | 2023
|Construction method of petal-shaped bionic steel structure roof
Europäisches Patentamt | 2023
|DOME-SHAPED ROOF CONSTRUCTION METHOD AND DOME-SHAPED ROOF INTERMEDIATE STRUCTURE
Europäisches Patentamt | 2016
|Dome-shaped roof construction method and dome-shaped roof intermediate structure
Europäisches Patentamt | 2018
|Construction method for large-span special-shaped steel structure roof
Europäisches Patentamt | 2024
|