Method for removing underground air-raid shelter and synchronously constructing foundation pit
The invention discloses a method for removing an underground air-raid shelter and synchronously constructing a foundation pit. The method comprises the following construction steps: 1, constructing an underground diaphragm wall and an enclosure structure; 2, gaps are filled, and air-raid shelter internal hoop type column formworks are synchronously installed; 3, foam concrete filling of the interior of the air-raid shelter and soil slope excavation are synchronously constructed; 4, a first enclosing purlin is arranged, and a first horizontal support is installed and constructed; 5, excavating a soil body, and constructing a second enclosing purlin and a second horizontal support; 6, excavating a soil body, and constructing a cushion layer and a bottom plate; 7, supporting and completely pouring the hoop type column formwork outside the air-raid shelter; 8, floor slab construction and reserved channel arrangement; 9, synchronously dismantling the air-raid shelter and the first horizontal support; 10, synchronously dismantling the second horizontal support and the air-raid shelter; and 11, foundation pit side wall construction. According to the technical scheme, synchronous construction of dismantling of the underground air-raid shelter and excavation of the newly-built foundation pit is achieved, the construction cost is reduced, and the technical and economic benefits are remarkable.
本发明公开了一种清除地下防空洞室并同步施工基坑的方法,包括如下施工步骤:1、地下连续墙以及围护结构施工;2、缝隙填充且同步安装防空洞内部抱箍式柱模板;3、泡沫混凝土填充防空洞内部以及土体放坡开挖同步施工;4、第一道围檩设置以及第一道水平支撑安装施工;5、开挖土体以及第二道围檩和第二道水平支撑施工;6、开挖土体进行垫层以及底板施工;7、防空洞外部抱箍式柱模板支护及全部浇筑;8、楼板施工及预留通道设置;9、防空洞及第一道水平支撑同步拆除;10、第二道水平支撑及防空洞同步拆除;11、基坑侧墙施工。本发明的技术方案实现了地下防空洞拆除与新建基坑开挖的同步施工,降低了施工成本,技术经济效益显著。
Method for removing underground air-raid shelter and synchronously constructing foundation pit
The invention discloses a method for removing an underground air-raid shelter and synchronously constructing a foundation pit. The method comprises the following construction steps: 1, constructing an underground diaphragm wall and an enclosure structure; 2, gaps are filled, and air-raid shelter internal hoop type column formworks are synchronously installed; 3, foam concrete filling of the interior of the air-raid shelter and soil slope excavation are synchronously constructed; 4, a first enclosing purlin is arranged, and a first horizontal support is installed and constructed; 5, excavating a soil body, and constructing a second enclosing purlin and a second horizontal support; 6, excavating a soil body, and constructing a cushion layer and a bottom plate; 7, supporting and completely pouring the hoop type column formwork outside the air-raid shelter; 8, floor slab construction and reserved channel arrangement; 9, synchronously dismantling the air-raid shelter and the first horizontal support; 10, synchronously dismantling the second horizontal support and the air-raid shelter; and 11, foundation pit side wall construction. According to the technical scheme, synchronous construction of dismantling of the underground air-raid shelter and excavation of the newly-built foundation pit is achieved, the construction cost is reduced, and the technical and economic benefits are remarkable.
本发明公开了一种清除地下防空洞室并同步施工基坑的方法,包括如下施工步骤:1、地下连续墙以及围护结构施工;2、缝隙填充且同步安装防空洞内部抱箍式柱模板;3、泡沫混凝土填充防空洞内部以及土体放坡开挖同步施工;4、第一道围檩设置以及第一道水平支撑安装施工;5、开挖土体以及第二道围檩和第二道水平支撑施工;6、开挖土体进行垫层以及底板施工;7、防空洞外部抱箍式柱模板支护及全部浇筑;8、楼板施工及预留通道设置;9、防空洞及第一道水平支撑同步拆除;10、第二道水平支撑及防空洞同步拆除;11、基坑侧墙施工。本发明的技术方案实现了地下防空洞拆除与新建基坑开挖的同步施工,降低了施工成本,技术经济效益显著。
Method for removing underground air-raid shelter and synchronously constructing foundation pit
清除地下防空洞室并同步施工基坑的方法
LI GUANG (Autor:in) / JIANG SHUAI (Autor:in) / HE JUN (Autor:in) / ZHANG MIN (Autor:in) / SONG ZHEN (Autor:in)
07.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
UNDERGROUND SHELTER AND METHOD FOR CONSTRUCTING UNDERGROUND SHELTER
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2022
|Construction method for underground diaphragm wall in underground air-raid shelter area
Europäisches Patentamt | 2020
|Construction method for underground continuous wall in underground air-raid shelter area
Europäisches Patentamt | 2020